Laserfiche WebLink
MINUTES <br />AIRPORT ADVISORY BOARD MEETING <br />TUESDAY, JANUARY 30, 1990 <br />COX FIELD TERMINAL <br />PARIS, TEXAS <br />1. The scheduled meeting was called to order at 6:00 P.M. by <br />Chairperson Mrs. Greta Greb. The following members were present: <br />Greta Greb, Chairperson <br />J.B. Ritchey <br />Jim Bell <br />J.W. Harrison <br />Cliff Lee <br />ABSENT: Victor Abeles <br />J.W. Ashmore <br />Also in attendance: Dick Boots and Jim Collier. <br />2. The minutes of the previous meeting (November 28, 1989) were read <br />and approved. <br />3. The AWOS funding was discussed. No funds are available through <br />the FAA for AWOS funding. Campbell Soup and Kimberly Clark may <br />possibly donate $2,000 or $3,000 towards the project. It was <br />decided that the Board would attempt to find a way to solicit <br />funds from industries and the private sector to cover the cost of <br />the project. A letter will be written by Mrs. Greb to the FAA <br />requesting that we be moved up on the list for AWOS Funding. The <br />letter would say that if the City has 1/3 of the total funding <br />available, the City would request to be moved up on the list <br />since the FAA would not have to fund the entire project. The <br />Board recommended that the Airport Support Group be directly <br />involved in soliciting funds. All industries, whether they are <br />Airport Users or not, will be asked to take part in this <br />fundraising. <br />4. It was reported that the Master Plan Grant was being written by <br />the FAA this week and would be in the hands of the City Staff <br />within one week. As soon as the grant is signed by the City of <br />Paris and returned to the FAA, the consulting firm will begin <br />work on the project. <br />5. A survey of the hanger renters, which was requested by the Board <br />at the November meeting, was presented by Dick Boots. After <br />review of the survey, it was decided that the City of Paris would <br />apply through the FAA for a 20 year 5% interest loan of $100,000. <br />The total cost of constructing 6 closed hangers would be <br />approximately $114,000. The City would have to come up with the <br />$14,000. above the total grant allocation. The $100,000. loan <br />from FAA would not be available until September of 1990. Mr. <br />