My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990
City-of-Paris
>
Boards and Commissions
>
AIRPORT ADVISORY BOARD
>
1972-2016
>
1990-1999
>
1990
>
1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 3:32:23 PM
Creation date
11/30/2017 3:32:22 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />AIRPORT ADVISORY BOARD MEETING <br />TUESDAY, SEPTEMBER 25, 1990 <br />COX FIELD TERMINAL <br />PARIS, TEXAS <br />1. The scheduled meeting was called to order at 6:00 P.M. by <br />Chairperson Greta Greb. The following members were present: <br />Greta Greb - Chairperson <br />J.B. Richey <br />Jim Bell <br />Tony Daigle <br />Victor Abeles <br />ABSENT: J.W. Harrison <br />J.W. Ashmore <br />Also in Attendance: Dick Boots - Jim Collier <br />2. The minutes of the previous meeting (April 24, 1990) were read and <br />approved. <br />3. New Board Member was welcomed. <br />4. A report concerning the loan from the Texas Department of Aviation <br />for hanger construction was given by Dick Boots. The TDA has <br />approved a loan for the City of Paris for hanger construction. The <br />total cost of the project is approximately $135,000. The City has <br />budgeted $13,500 for their down payment. The remaining 90% will be <br />paid back to the TDA over a 20 year period. The hanger will have <br />spaces for seven airplanes. Specifications will be prepared during <br />October & November with the project going out for bid in December. <br />All taxiways leading to the new hanger will be of concrete <br />construction. <br />5. The adopted budget for 1990 -91, was presented. The operating <br />budget stayed basically the same as the past year. Capital Outlay <br />Projects included in the new budget are an asphalt overlay for the <br />parking area and entrance road and $13,500- for the down payment on <br />the hanger construction loan. <br />6. A report was given by Dick Boots concerning the terminal renovation <br />funds. The "oil overcharge funds" for assisting Airports in <br />completing energy saving projects will be administered by the <br />Governor's Office rather than the TDA. It is still uncertain as to <br />whether these funds will become available. Preliminary drawings <br />have been prepared by Bucker, Willis & Ratliff for both the <br />terminal renovation and a 27' X 46' addition. When the funds do <br />become available, we will be ready to move as we have plans ready <br />for the renovation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.