My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991
City-of-Paris
>
Boards and Commissions
>
AIRPORT ADVISORY BOARD
>
1972-2016
>
1990-1999
>
1991
>
1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 3:34:19 PM
Creation date
11/30/2017 3:34:19 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. A report on the hanger construction was given by Dick Boots. <br />Bids were received for the project with Drake Construction <br />being the low bidder. The engineering department recommended <br />to the Council that the alternate bid from Drake Construction <br />be accepted. The Alternate bid called for asphalt taxiway and <br />apron areas instead of the concrete that was originally <br />specified. The total cost will be $134,189.00. The hanger <br />construction should be completed in approximately three <br />months. The chairperson designated J. B. Richey and J.W. <br />Ashmore to serve on a committee to decide what lease fees <br />should be recommended on all Cox Field hangers. <br />8. Funds for the terminal renovation are available through the <br />TDA. The problem is that funding for terminal renovation is <br />very low on the priority list for funding. <br />9. The Texas Airport Operators conference will be held in April <br />in Austin. Dick Boots, Jim Collier, Greta Greb, Eric Clifford <br />and Michael E. Malone will be attending the conference. <br />10. Paul Malir of Bucher, Willis & Ratliff was in attendance at <br />the meeting. The Advisory Board and City Staff reviewed the <br />master plan draft over the last 30 days. They presented <br />additions and deletions to the plan to the Consultant. The <br />FAA has completed their review. Once the TDA reviews the <br />plan, it will be ready for the final printing. The completed <br />plan should be in our hands in approximately three weeks. <br />11. The meeting was adjourned at 7:10 P.M. <br />G, 41 <br />Dick Boots <br />Recorder <br />DB:td <br />