My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003
City-of-Paris
>
Boards and Commissions
>
BUILDING AND STANDARDS COMMISSION
>
1979-2016
>
2003
>
2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2017 8:40:00 AM
Creation date
12/1/2017 8:40:00 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE REGULAR MEETING <br />OF THE <br />BUILDING AND STANDARDS COMMISSION <br />Monday, November 17, 2003 <br />4:00 P.M. <br />1. Chad Brown called the Building and Standards Commission Meeting to <br />order at 4:OOP.M. <br />2. Roll was called. <br />A. The following members were present: <br />Chad Brown Mary Crumpler <br />Patrick Brown Harrell Tippitt <br />Lucius Joe, Jr. Pike Burkhart <br />Brad Archer <br />B. The following members were absent: <br />Tommy Robinson Mark Rothfuss <br />Billy Hill Ward Hall <br />3. Approval of Minutes of October 20, 2003: <br />A motion was made by Lucius Joe, Jr. to approve the meeting minutes, and Mary <br />Crumpler seconded the motion. The motion carried unanimously. <br />4. Public hearing to consider presentations by Code Inspector of the City of <br />Paris, and owner(s) and / or lien holders of the below listed properties which <br />have been given notice of a violation of City Ordinance that structures need <br />to be demolished because of fire damage: <br />A. 106 NE 12th, Lot 3, City Block 32 -E <br />The property Owner, Mr. Michael King, stated that he intends to repair the <br />property. Mr. King requested that the Commission grant him 60 days to <br />complete the repairs. Mike Alexander suggested that the Commission <br />grant Mr. King's request. <br />Pike Burkhart made a motion that the building be repaired within 60 days <br />with a $1000 per day civil penalty if the building was not repaired within <br />the 60 days. Brad Archer seconded the motion. The motion carried <br />unanimously. <br />11 -17 -03 Building & Standards Meeting Minutes.doc Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.