Laserfiche WebLink
eventually put on a metal roof. A motion was made by Steve Brown, seconded by <br />Pike Burkhart, Sr. For the property to be repaired within 60 days and brought back <br />to the May 16 meeting for reconsideration. Motion carried unanimously. <br />A. 555 20th Street S.E.; Part of Lot 10 and Lots 11 and 12, Block 6, Highland Park <br />Addition <br />Motion was made by Chad Brown, seconded by Ryan Lassiter for the property to be <br />demolished within 30 days with a $1,000 per day civil penalty, and if the property is <br />not demolished within the 30 day time period, the City will demolish. Motion carried <br />unanimously. <br />B. FM 195; Lot 13, City Block 322 <br />Motion was made by Chad Brown, seconded by Chris Brown for the property to be <br />demolished within 30 days with a $1,000 per day civil penalty, and if the property is <br />not demolished within the 30 daytime period, the City will demolish. Motion carried <br />unanimously. <br />C. FM 139; Lot 11, City Block 322 <br />Motion was made by Ryan Lassiter, seconded by Mary Crumpler for the property to <br />be demolished within 30 days with a $1,000 per day civil penalty, and if the property <br />is not demolished within the 30 day time period, the City will demolish. Motion <br />carried unanimously. <br />E. 1124 W. Cherry; Lot 4, City Block 84 <br />Motion was made by Chris Brown, seconded by Steve Brown for the property to be <br />demolished within 30 days with a $1,000 per day civil penalty, and if the property is <br />not demolished within the 30 daytime period, the City will demolish. Motion carried <br />unanimously. <br />F. 1354 3rd Street S.W.; Lot 6, City Block 171 <br />Motion was made by Mary Crumpler, seconded by Zach Saffle for the property to be <br />demolished within 30 day with a $1,000 per day civil penalty, and if the property is <br />not demolished within the 310 day time period, the City will demolish. Motion carried <br />unanimously. <br />G. 1366 3rd Street S.W.; Lot 7, City Block 171 <br />This structure is right beside Rodgers -Wade. The roof is buckling and limbs from <br />the trees have fallen through. The house is pulling loose from the chimney. The <br />structure is unsecured with a rotten shed. Ms. Robert E. Lee's wife called and said <br />that he is deceased. Motion was made by Steve Brown, seconded by Harrell Tippitt <br />for the property to be demolished within 30 days with a $1,000 per day civil penalty, <br />and if the property is not demolished within the 30 day time period, the City will <br />demolish. Motion carried unanimously. <br />4. Status report related to properties on which the Commission has previously issued <br />