My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Contract with Archer Construction for new northwest EMS Station
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2018
>
03 - MARCH
>
03/12/2018
>
13 - Contract with Archer Construction for new northwest EMS Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 3:09:57 PM
Creation date
3/8/2018 3:04:22 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 - ENUMERATION OF CONTRACT DOCUMENTS: <br />6. i The Contract Documents including executed bid form, which constitute the entire <br />agreement between the owner and the Contractor, are described in Article 7 and, <br />except for any Modifications issued after execution of this Contract, are enumerated as <br />follows: <br />Drawings and Specifications <br />Addenda <br />ARTICLE 7 - CONTRACT DOCUMENTS: <br />TI The Contract Documents consist of this Contract and General Conditions, <br />Supplementary and other Conditions, the Drawings, the Specifications, all Addenda <br />issued prior to the execution of this Contract, and all Modifications issued by the <br />owner after execution of the Contract such as Change Orders, Supplemental <br />Instructions such as written interpretations and written orders for minor changes in the <br />work. The intent of the Contract Documents is to include all items necessary for the <br />proper execution and completion of the work. The Contract Documents are <br />complementary, and what is required by one shall be as binding as if required by all. <br />Work not covered in the Contract Documents will. not be required unless it is <br />consistent therewith and reasonably inferable therefrom as being necessary to produce <br />the intended results. <br />7.2 By executing the Contract, the Contractor represents that he has visited the site and <br />familiarized himself with the: local conditions under which the work is to be <br />performed, <br />7.3 The work comprises the completed construction required by the Contract Documents <br />and includes all labor necessary to produce such construction, and all materials and <br />equipment, and insurance incorporated in such construction. <br />7.4 This contract shall prevail in the event any contract documents conflict. <br />ARTICLE 8 - ADMMISTRATION: <br />8.1 Owners' authorized representatives are: <br />Carla Easton, City Engineer, City of Paris <br />John Godwin, City Manager, City of Paris <br />CONTRACT - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.