My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Contract with Archer Construction for new northwest EMS Station
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2018
>
03 - MARCH
>
03/12/2018
>
13 - Contract with Archer Construction for new northwest EMS Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 3:09:57 PM
Creation date
3/8/2018 3:04:22 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or such person(s) designated in writing by same as authorized representative(s) who <br />will provide administration of the Contract and shall at all times have access to the <br />work. <br />8.2 If the Contractor fails to correct defective work or persistently fails to carry out the <br />work in accordance with the Contract Documents, owner by a written order may order <br />the Contractor to stop the work, or any portion thereof, until the cause for such order <br />has been eliminated. <br />8.3, Owner will be the interpreter of the requirements of the Contract Documents and have: <br />the sole authority to rqJect work or dictate the method of correction for deficient work. <br />ARTICLE 9 - APPROVAL: <br />9.1 Owner will review and approve or take appropriate action upon the Contractor's <br />submittals such as Shop Drawings, Product Data and Samples. Owner reserves the <br />right to reject any product solely on the basis of preference. <br />ARTICLE 10 - CONTRACTOR: <br />10.1 Contractor shall supervise and direct the work, using his best skill and attention and lie <br />shall be solely responsible for all construction means,, methods, techniques, sequences <br />and procedures and for coordinating all portions of the work Linder the Contract, <br />10.2 Unless otherwise specifically provided in the Contract Documents, the Contractor <br />shall provide and pay for all labor, materials, equipment, tools, construction equipment <br />and machinery, transportation, and other facilities and services necessary for the <br />proper execution and completion of the work, whether temporary or perinarient and <br />whether or not incorporated or to be incorporated in the work, <br />10.3 Contractor shall at all times enforce strict discipline and good order among his <br />employees and the employees of any and all subcontractors and shall not employ on <br />the work any unfit person or anyone not skilled in the task assigned to him. Obscene <br />language or gestures, "cat -calling", etc. will not be tolerated. Contractor shall at all <br />times enforce these requirements for all within his Contract by causing said to be <br />brought into conformance or removed frorn the project. <br />10.4 Contractor warrants that all materials and equipment incorporated in the work will be <br />new unless otherwise specified, and that all work will be of good quality, free from <br />faults and defects, and in conformance with the Contract Documents,, All work not <br />conforming to these requirements shall be considered defective, <br />CONTRACT - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.