My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Church Street Reconstruction Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2018
>
07 - JULY
>
July 9
>
09 - Church Street Reconstruction Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 12:37:11 PM
Creation date
7/5/2018 12:33:18 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 9 <br />3. Use asphalt pavement, removing the proposed enhanced paving in the intersections and <br />crosswalks. <br />These and other cost reducing factors will be considered in order to keep the construction cost <br />down. A formal project change order can be brought before the City Council, if so needed for a <br />contract increase once all cost saving options can be fully evaluated. Please note, this design is <br />consistent with many existing residential streets, including Church St. It has been used on our <br />other street projects like 7t' SW and 3rd SE, and it also follows the advice of the Toole Design <br />Group. <br />The contract documents require this project to be completed within 365 calendar days after <br />issuance of the notice to proceed. Construction is anticipated to begin in late August. <br />BUDGET: Funding is available in the 2017 Street Bond Fund. <br />RECOMMENDATION: Authorize the city manager to execute a contract with Richard Drake <br />Construction for completion of the Church Street Reconstruction Project and related change <br />orders for an amount not to exceed $3,100,000.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.