My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Church Street Reconstruction Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2018
>
07 - JULY
>
July 9
>
09 - Church Street Reconstruction Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 12:37:11 PM
Creation date
7/5/2018 12:33:18 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 9 <br />2. RDC has won the last 2 street project bids, which were competitive with multiple bidders. <br />On both projects, RDC was significantly lower than other bidders. This can affect <br />interest in future projects if a local contractor repeatedly outbids the competition. <br />3. RDC performed well on past projects for the City, and they are qualified to perform the <br />work on Church Street. <br />4. A rebid could result in higher prices due to rising material costs and lack of competition. <br />Staff recommends award of the base bid plus materials alternate A, to provide an asphalt street <br />with concrete curbs, gutters and sidewalks, for an amount of $2,922,117.65. <br />After the bid opening, the city received a request to change the sidewalk design by removing the <br />existing grass strip between the sidewalk and back of curb, which currently exists today. The <br />concern is for long term maintenance/mowing of the grass along some properties. The current <br />plan for sidewalks on Church Street is to replace them in their original, existing configuration, <br />meaning sidewalks along the commercial areas would be replaced behind the curb, and <br />residential lots would retain the traditional grass strip. The current design considers the <br />following constraints, which are further explained in the attached summary: <br />a. Limited ROW <br />b. Franchise utility pole location <br />c. Accessibility requirement of the ADA <br />d. Safety <br />e. Historical appropriateness <br />Simply relocating the 4' sidewalk to be directly behind the curb will reduce pedestrian safety <br />through the corridor, particularly for small children, and will compromise project compliance <br />with the Americans with Disabilities Act (ADA) due to utility poles and other appurtenances <br />within the ROW. Therefore, in order to remove the 2' grass strip between the curb and sidewalk <br />for the entire length of the project, the concrete must be widened accordingly, which results in a <br />cost increase of approximately $70,000. <br />Staff has considered cost saving strategies in order to meet the needs of the project, address the <br />residents' concern, and to minimize impacts on future street projects. We propose the following <br />design modifications to address the mowing concern while balancing cost and aesthetics. <br />1. Widen the sidewalk to 6', and remove the grass strip from Hearne to Washington where <br />the ROW is narrow. (+$32,000) <br />2. Keep the existing grass strip from Washington to Sherman, and along the west ROW to <br />Kaufman, where the ROW is wider, to reduce cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.