Laserfiche WebLink
i. 10" Concrete Paving at Production Building and Drives — 319,225 sf <br />j. 6" Paving at Employee Parking — 56,238 sf <br />k. Pavement at Railroad Crossovers — 3 ea <br />1. 4" Sidewalks/Stoops — 8,083 sf <br />6. Concrete foundations included for production building, poly storage, boiler <br />building and business office. (Slab on Grade with associated grade beams) <br />a. Production Building — 290,640 sf <br />i. 6'-0" thick Concrete at Coiling Machine <br />ii. 2'-6" thick Concrete at Coil Staging Area <br />iii. 1'-8" thick Concrete at Curing Area <br />iv. 1'-0" thick Concrete at Other Areas <br />v. Cased Piers - 380 ea <br />vi. Equipment Pits included as shown on layout provided <br />vii. Concrete Slabs on Metal Deck at interior offices <br />b. Poly Storage Building — 2,050 sf <br />i. 1'-0" thick Concrete <br />ii. Piers - 8 ea <br />c. Boiler Building —1,200 sf <br />i. 1'-0" thick Concrete <br />ii. Piers — 4 ea <br />d. Business Building — 14,400 sf <br />i. 6" thick Concrete <br />ii. Piers - 24 ea <br />7. Masonry 8" CMU walls for poly storage building, interior production offices, <br />production restrooms and split -face CMU wainscot at business office. <br />a. Poly Storage Building — 2,850 sf <br />b. Interior Production Offices & Restrooms — 9,500 sf <br />c. Business Office Split -Faced CMU Wainscot - 2,240 sf <br />8. Structural steel supports for 3 areas of production cranes, roof structures for CMU <br />walls areas, bollards, ladders, and embeds. <br />a. Roof Ladders — 2 ea <br />b. Bollards — 300 ea <br />c. Concrete Embeds at Machinery - Allowance <br />d. Embeds, Joists and Metal Decking <br />i. Interior Offices — 5,000 sf <br />ii. Production Area Restrooms — 610 sf <br />iii. Production Coil Office — 144 sf <br />iv. Poly Storage — 2,050 sf <br />e. Independent Crane Steel Structures — 3 ea <br />