My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-025 Tax Abatement Agreement with SpiralWeld
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2018
>
2018-025 Tax Abatement Agreement with SpiralWeld
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 11:46:32 AM
Creation date
9/25/2018 11:45:45 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Millwork cabinets and countertops have been included for breakrooms in <br />production office and business office areas. <br />a. Production Offices — Allowance of $32,000.00 <br />b. Business Office — Allowance $22,000.00 <br />10. Expansion/ control joint sealants for paving, foundations, and CMU walls. <br />11. Hollow metal frames, hollow metal & wood doors with hardware for production <br />building, business office/ locker room and shipping office. <br />12. Overhead steel rolling doors at production building. <br />a. 20'-0" x 16'-0" O.H. Coiling Doors — 22 ea <br />b. 26'-0" x 20'-0" O.H. Coiling Doors — 5 ea <br />c. 12'-0" x 8'-0' O.H. Coiling Doors — 3 ea <br />d. 20'-0" x 60'-0" Manual Sliding Door —1 ea <br />13. Interior stud framing and drywall, ceilings, painting, floor finishes, miscellaneous <br />specialties for production office/ restrooms, business office/ locker room and <br />shipping office. <br />44-. Doek equipme4# for- the ofte loreatien a4 pr-oduetion building ineludes dersk seats—, <br />45 leveler- .,,,.� ,-est...,;«+ a4 the p ...7,,etie,, lead:,,...1eek <br />.✓ate aV � ViVl K11Y 1VJ�1 iL1114 {11. 411V l./1 <br />15. Appliance allowance for production and business office breakroom areas. <br />16. Pre -Engineered metal buildings: <br />a. Production Building - 290,640 PEMB with roof and wall insulation. <br />b. Business Office Building —14,400 SF PEMB with roof and wall <br />insulation. <br />17. Mobile/ Portable building for 1,000 SF shipping office. <br />18. Cranes at production building include: 3 -ton for maintenance, 55 -ton for coil <br />storage,'/2-ton jib at coil storage, 1 -ton at curing, 1 -ton at lining and 10 -ton at <br />lining. <br />19. Plumbing systems: <br />a. Production Building — Water, sewer and vent piping for office restroom <br />fixtures and production restrooms fixtures, floor drains, natural gas lines, <br />compressed air lines and steam lines. <br />b. Business Office — Water, sewer and vent for fixtures at restrooms, locker <br />room and breakroom. <br />c. Shipping Office — Water, sewer and vent for fixtures at restroom. <br />20. New fire sprinkler protection system at production coating area and poly storage <br />building only. <br />21. Mechanical systems: <br />a. Production Building - Heat and AC to production offices/ breakroom/ <br />restrooms, infrared tube heat and dehumidification at coating area, heat <br />and AC to coating mixing room with roof top exhaust and unit heaters at <br />Soi,.ftfh Church <br />
The URL can be used to link to this page
Your browser does not support the video tag.