Laserfiche WebLink
poly storage building, production areas to receive roof top exhaust fans to <br />perform 6 air changes per hour. <br />b. Business Office — Heat and AC for whole building with restroom and <br />locker exhaust fans. <br />c. Shipping Office — Heat and AC for whole building with restroom exhaust. <br />22. Fire Alarm Systems to include strobe, horns and wiring at production building, <br />office building. Includes an independent aspiration system at production coating <br />area. <br />23. Electrical Systems: <br />a. Site — Provide conduit distribution to each building location from service <br />provider transformer, site lighting for laydown, parking lots and roadways. <br />b. Production Building — Provide electrical distribution for power and <br />lighting, conduits raceways, light fixtures, gear and panels, transformers, <br />MSA gear, MCC gear, disconnects, connection to equipment, overhead <br />doors, cranes, installation of grounding system, perform volt testing and <br />terminations. <br />c. Business Office — Provide electrical distribution for power and lighting, <br />conduits raceways, light fixtures, gear and panels, data drops at office to <br />above ceiling. <br />d. Shipping Office — Provide electrical distribution for power and lighting, <br />conduits raceways, light fixtures, gear and panels, data drops at office to <br />above ceiling. <br />TEAM <br />