My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/18/2018 Minutes
City-of-Paris
>
Boards and Commissions
>
PLANNING AND ZONING COMMISSION
>
2018
>
09/18/2018 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2018 8:00:49 AM
Creation date
10/2/2018 7:56:56 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Revise the water main location to match the approved site plan. <br />RECOMMENDATION: Approve the final plat with noted revisions. <br />Motion was made by Keith Flowers to approve the Final Plat with noted revisions and <br />seconded by John Lee. Motion carried 6-0. <br />11. Conduct a public hearing and take possible action on an updated 2018 Comprehensive Plan <br />for the City of Paris. <br />Carla Easton, City Engineer discussed the background and status of issue with commissioners. <br />BACKGROUND: The City of Paris has a history of comprehensive plans spanning a period of <br />over 100 years. The latest and currently adopted plan is the 2001 Comprehensive Plan. In <br />2008, the city council updated and adopted the Paris Future Land Use Plan Map and the Plan <br />Map Legend Explanations; the remainder of the 2001 Comprehensive Plan remains intact and <br />adopted. <br />Well -accepted city planning practice is for comprehensive plans to be generally reviewed <br />annually, with potential for substantial updates every three to five years as situations warrant. <br />It has been ten years since the future land use plan map and the plan map definitions have been <br />updated, and 17 years since Paris' full comprehensive plan has been adopted and except for the <br />future plan map and its definitions, has not been reviewed or updated. Therefore, the project <br />described herein addresses the 2018 Comprehensive Plan Update, for the purposes of (1) <br />creating an updated comprehensive plan document to support as appropriate the 2001 <br />Comprehensive Plan recommendations that remain relevant, and (2) to make new and <br />reinforce previous recommendations that will strengthen the implementation process of the <br />city's comprehensive plan program and (3) to address situations and conditions regarding <br />differing physical conditions in Paris that have occurred during the past decade and beyond. <br />STATUS OF ISSUE: <br />A. 2018 Comprehensive Plan Update preparation and goal: A fundamental <br />principle that guided the 2018 plan update is the recognition that much of the 2001 plan <br />remains highly relevant today. Therefore, the goal was to prepare a document in 2018 <br />that was not the "full" or traditional Comprehensive Plan that exemplified the previous <br />Paris comprehensive plans. Rather, the 2018 update is characterized by very current <br />references to certain components of the 2001 plan, descriptions of present situations, <br />and supported with up-to-date text, and graphics. <br />
The URL can be used to link to this page
Your browser does not support the video tag.