My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2019 Minutes
City-of-Paris
>
Boards and Commissions
>
HISTORIC PRESERVATION COMMISSION
>
2019
>
06/12/2019 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2019 2:49:36 PM
Creation date
7/16/2019 2:48:56 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULAR MEETING MINUTES <br />CITY OF PARIS HISTORIC PRESERVATION COMMISSION <br />WEDNESDAY JUNE 1212019 <br />4:00 P.M. <br />Present <br />Chris INIX, ("halrlMdl <br />Mike Lira - <br />Linda VandiVel, <br />Rai idy hider„ Secretary <br />GFiec', F"11)1111(c <br />Linda Knox, Council I'MIS011 <br />C,iu-la Easion, City Eo piccr <br />Pdgc Ed%iurds, Perinit'Fechnician <br />City olTans Conininni(y Development <br />1. Call meeting to order -Chairman <br />Absent <br />Silrilh B;11'hCe <br />Matt Coyle, Vice ("hall, <br />Guests <br />Marvin (;odey <br />Ronnie Mickel, <br />2. Approval of minutes from previous meeting May 8, 2019 Chairman Dux found a corrections <br />that needed to be made to the title of the minutes, and Commissioner Vandiver asked that <br />Paul Denney be added as a guest. Further into the meeting Commissioner Emmite corrected <br />the change in the date. Minutes ivere approved ly acclaniation with corrections. <br />Marvin Gorley introduced the project architect Ronnie Rucker, who has assisted on the, <br />rehabilitation project design, Mr. Rucker is available to answer any questions. <br />Mr. Gorley began with the proposed project of expansion of 255, 1 " SW, South Main Iron <br />mechanic repair shop. The project includes expansion for a wash bay on the west (SW <br />I't) and furthest north side of the original building where currently there is a repair shop. <br />On the east side facing S. Main, the plan is to expand the area with wood approximately <br />10 to 15 feet using wood siding and framing. This addition will differentiate itself from <br />the original structure and can be removed in the future without han-ning any historic <br />materials. The custom doors will be reused. <br />The second phase involves the three large openings on South Main St. and will included <br />removal of the haddock blocks and leaving the original openings intact. An interior will <br />be built inside the open area. Mr. Gorley provided historic photos for the commissioners <br />documenting the openings were original, and the building housed a drive through gas <br />station in its early phases. <br />The owner is requesting removal of the circa 1980 roof, and reinstalling the original roof <br />line to expose the windows between the properties. In addition to the roof, the owners <br />would like to create an atrium to allow lighting inside. <br />Chain-nan Dux opened the floor for discussion, hearing no questions, he reviewed the <br />project with the commissioners and made a motion to approve the project as presented, <br />
The URL can be used to link to this page
Your browser does not support the video tag.