My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-002-RES WHEREAS, the City Council of the City of Paris did heretofore in Resolution No. 90-100, dated December
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1990-1999
>
1992
>
1992-002-RES WHEREAS, the City Council of the City of Paris did heretofore in Resolution No. 90-100, dated December
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:32:58 PM
Creation date
4/11/2005 2:06:15 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1992
Doc Type
Resolution
CITY CLERK - Date
1/13/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13. The Sponsor agrees to perform the following: <br /> <br />a. Furnish a construction management program to FAA prior to the start of construction <br />which shall detail the measures and procedures to be used to comply with the quality <br />control provisions of the construction contract, including, but not limited to, all quality <br />control provisions and tests required by the Federal specifications. The program shall <br />include as a minimum: <br /> <br />1. The name of the person representing the sponsor who has overall responsibility for <br />contract administration for the project and the authority to take necessary actions to <br />comply with the contract. <br /> <br />2. Names of testing laboratories and consulting engineer firms with quality control <br />responsibilities on the project, together with a description of the services to be <br />provided. <br /> <br />3. Procedures for determining that testing laboratories meet the requirements of the <br />American Society of Testing and Material's standards on laboratory evaluation, <br />referenced in the contract specifications (D 3666, C 1077). <br /> <br />4. Qualifications of engineering supervision and construction inspection personnel. <br /> <br />5. A listing of all tests required by the contract specifications, including the type and <br />frequency of tests to be taken, the method of sampling, the applicable test standard, <br />and the acceptance criteria of tolerances permitted for each type of test. <br /> <br />6. Procedures for ensuring that the tests are taken in accordance with the program, that <br />they are documented daily, that the proper corrective actions, where necessary, are <br />undertaken. <br /> <br />b. Submit at completion of the project, a final test and quality control report documenting the <br />results of all tests performed, highlighting those tests that failed or did not meet the <br />applicable test standard. The report shall include the pay reductions applied and reasons <br />for accepting any out-of-tolerance material. <br /> <br />Page 4 of 6 Pages <br /> <br />FM Form 5100-37 (10-89) Development or Nol$e Pfogram <br />
The URL can be used to link to this page
Your browser does not support the video tag.