My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Pump Track Construction Contract with American Ramp Company
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
03 - MARCH
>
March 9
>
09 - Pump Track Construction Contract with American Ramp Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 2:30:07 PM
Creation date
3/5/2020 2:26:15 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE TO PROCEED <br />TO: <br />ADDRESS: <br />OWNER: City of Paris, Texas <br />Dated <br />PROJECT: PARIS PUMP TRACK - TPWD GRANT PROJECT 48-001178 <br />You are notified that the Contract Time under the Contract for the above referenced Project will <br />commence to run on the 18th dgy of Ma 2020. On or within 10 days of that date, you are to <br />start performing your obligations under the Contract Documents. In accordance with Item 103.6 <br />of the October 2004 Edition of the Public Works Construction Standards - North Central Texas as <br />amended and published by the North Central Texas Council of Governments, the dates of <br />Substantial Completion and Final Completion are the 17th day of July, 2020 and the 16th day <br />of August, 2020, respectively. <br />Before you may start any Work at the site, the Contract Documents specify that you must <br />furnish performance, payment and maintenance bonds required by the Contract Documents for <br />the Project and procure and maintain insurance in accordance with the Construction Agreement <br />and provide the OWNER proof of all required insurance coverages for the Project. <br />Also before you may start work at the site, you must <br />Provide a proposed schedule for the Work providing for the completion of the Project within the <br />time provided herein above specifically including, but not limited to, a construction phasing plan <br />and the proposed completion dates of all major elements. <br />Issued By: <br />(PRINTED NAME) <br />Acceptance of Award: <br />(PRINTED NAME) <br />(AUTHORIZED SIGNATURE) (AUTHORIZED SIGNATURE) <br />(TITLE) (TITLE) <br />(DATE) (DATE) <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.