My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Pump Track Construction Contract with American Ramp Company
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
03 - MARCH
>
March 9
>
09 - Pump Track Construction Contract with American Ramp Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 2:30:07 PM
Creation date
3/5/2020 2:26:15 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />TASK 1.0- CONSTRUCTION <br />1.1 INCLUDES: <br />• All labor, supplies, tools, materials, and equipment required to construct an <br />asphalt pump track <br />• Earthmoving techniques _. <br />• Pour and Finish Asphalt <br />• Purchase, coordinate and install shade structures in accordance with design <br />submittals approved by the CITY <br />• All scope of work is limited to the footprint of the asphalt pump track <br />1.2 EXCLUDES: <br />• Clearing and Grubbing of Site — To be done by owner <br />• Non -DOT Gravel — To be provided by owner <br />• Fencing of any kind <br />• Site testing and inspections: standard proctor/density testing, onsite concrete <br />cylinders, engineering, surveying, or testing services. <br />• Union wages or taxes <br />• Utility, mechanical, electrical, plumbing work, relocation or repairs of any <br />kind. <br />• Any landscaping <br />• Toxic or hazardous material handling or removal. <br />• Pedestrian protection, walkways, dust protection, temporary enclosures, <br />protection of work or adjacent items. <br />• Soil treatment, termite treatment, landscaping, or reseeding. <br />• Dewatering, silt fence, soil stabilization, erosion control, street cleaning, and <br />traffic control. <br />• Removal and/or replanting of any trees or shrubs. <br />• Any work not specifically indicated above. <br />1.3 CUSTOMER PROVIDES: <br />• Clearing and Grubbing of Site <br />• Flat site with Non -DOT Gravel <br />• Sufficient water, light, and electrical power within 100 feet of work areas. <br />• Unobstructed, safe, and continuous access to work area with heavy <br />equipment. All weather roads for heavy equipment. <br />• All necessary site information including topography, site surveying, and <br />elevations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.