My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14 - Professional Services Contract with Hayter - Retaining Wall along Johnson Woods Creek
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
07 - JULY
>
July 27
>
14 - Professional Services Contract with Hayter - Retaining Wall along Johnson Woods Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 10:05:51 AM
Creation date
7/24/2020 9:27:36 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />CITY OF PARIS <br />FOR <br />645 JOHNSON WOODS DRIVE CHANNEL BANK STABILIZATIO1 <br />.............. _Q il"i a" IIIIN *I <br />The CITY proposes to construct a channel bank stabilization solution along the <br />backside of the property located at 645 Johnson Woods Drive, The limits of this project <br />will be an existing gabion wall (north) and an existing concrete bag wall (south); <br />approximately 45 linear feet. Services by the CONSULTANT shall include all aspects of <br />the work set forth in the following scope of services. <br />a 0 1 •9 i"T Lt A� <br />PesLgn Phase Services <br />1 Development of the design including plans and technical specifications up <br />to a 90% completion level. <br />a. The limits of this project will be an existing gabion wall (north) and <br />an existing concrete bag wall (south); approximately 45 linear feet. <br />b. Gabion basked (plan view) design, details, and technical <br />specifications. <br />i. The City of Paris has requested a limited design in which <br />Hayter Engineering shall provide the minimum amount of <br />detail necessary for the contractor to complete the work. As <br />such, Hayter Engineering's plan view will simply show the <br />extents of the gabion wall and details will show the typical <br />construction of said wall. <br />c. Prepare an erosion control plan. <br />i. The erosion control plan shall illustrate the locations of rock <br />check dams, or any other necessary erosion control <br />measures that should be installed during construction <br />activities. <br />M . HEI QA/QC Review. <br />e. Submit 90% plans and technical specification to the Owner for <br />review and comment. <br />2. Development of the final (100%) design including plans and technical <br />specifications for the project. <br />a. Address and incorporate all 90% design comments from the Owner <br />into the final plans and technical specifications. <br />b. Prepare a quantity take -off for the Owner. <br />c. Coordination with the Owneri <br />
The URL can be used to link to this page
Your browser does not support the video tag.