My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
07 - JULY
>
July 27
>
27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 10:12:25 AM
Creation date
7/24/2020 9:45:42 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conduct eight teleconference progress meetings with Owner's staff. <br />• Provide an agenda in advance of all scheduled meetings and provide subsequent meeting <br />minutes. <br />The final design phase is anticipated to have three major submittals: a 60%, 90%, and 100°/x. For the <br />project bidding, the following applies: <br />• Gatver will include (2) designed deductive alternates to provide award flexibility to match with <br />available project funding. <br />• Multiple design scenarios or bid packages and/or pre -purchased equipment packages are not <br />included as part of the level of effort provided with this Agreement. <br />The Contract Documents will consist of drawings and specifications that set forth requirements for <br />construction of the improvements, and shall include proposal forms, notice to bidders, bid forms, bond <br />forms, and other information as required by Owner to competitively bid the work. <br />Garver and the TWDB's standard contract forms including documents from the Engineers Joint Contract <br />Documents Committee (EJCDC) will be used, along with Garver's standard drawing format and <br />technical specifications. Garver will utilize the TWDB and Engineers Joint Council Documents <br />Committee (EJCDC) standard documents as a base for developing the project's front end documents. <br />EJCDC's standard General Conditions shall be utilized with edits being provided by the Supplemental <br />Conditions. Standard forms, as required by the funding source, will be incorporated. <br />Garver will review potential construction sequencing and the overall approach to project implementation <br />to minimize disruption of the WWTP operation during construction. This review will occur at the Design <br />Submittal Workshops. <br />During final design, Garver will host an O&M workshop at the WWTP to solicit input from staff on the <br />final design documents. <br />Garver will lead a review workshop for the two (2) final design phases: 60% and 90%. These <br />workshops will be held in Garver's Frisco, Texas office to solicit comments and feedback from the <br />Owner. <br />The Process Control and SCADA workshop will be a component module of the 60% Design <br />Workshop. The purpose of these module will be to coordinate the Owner's desired method and <br />level of process control and remote operation capabilities. <br />The Preliminary Design Workshop module will include an overview of the current and proposed <br />SCADA system architecture along with a basis of design for expected improvements. The Owner's IT <br />staff, WWTP's Operations staff and WWTP's Maintenance staff may attend as needed. The 60% <br />Design Workshop module will include a review of the Preliminary Design Workshop module action <br />items, an update regarding the proposedSCADA system components, advanced design concepts, the <br />path forward to completion of the project,and programming services. <br />Final Design Deliverables shall be: <br />• Two (2) hard copies of the draft 60% Design Documents (including half size drawings) and a <br />PDF copy. <br />• Two (2) hard copies of the draft 90% Design Documents (including half size drawings) and a <br />PDF copy. <br />• Two (2) hard copies of the 100% Design Documents (including half size drawings) and a PDF <br />COPY. <br />• Two (2) hard copies of the Bidding Documents (including half size drawings) and a PDF copy. <br />• Required copies for Funding and Technical Review as required by State Agencies. <br />Appendix A - Scope of Services 5 of 8 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.