My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
07 - JULY
>
July 27
>
27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 10:12:25 AM
Creation date
7/24/2020 9:45:42 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Prepare conformed documents (four half size sets). <br />• Distribute as required to State Agencies and Funding Agencies <br />The following items are not included under this agreement but will be considered as Extra Work. Extra <br />Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner and <br />the Engineer. <br />1. Construction Phase Engineering Services. <br />2. Construction Phase On-site Construction Management Services. <br />3. Construction materials testing. <br />4. Geotechnical services. <br />5. SSES, I&I analysis, and/or sewer system survey. <br />6. Design of improvements off-site aside from the influent pipeline. <br />7. Utility relocation coordination or design. <br />8. Hydraulics and hydrology for floodway No -Rise Certification and Individual 404 permit. <br />9. Redesign for the Owner's convenience or due to changed conditions after previous alternate <br />direction and/or approval. <br />10. Submittals or deliverables in addition to those listed herein. <br />11. Invasive structural evaluation techniques beyond visual observation of existing structures at <br />grade and existing record drawings. <br />12. Preparation of a Storm Water Pollution Prevention Plan (SWPPP). <br />13. Environmental Handling and Documentation beyond those previously identified, including <br />wetlands identification or mitigation plans or other work related to environmentally or <br />historically (culturally) significant items. <br />14. Floodplain delineation and coordination with FEMA and preparation/submittal of a CLOMR <br />and/or LOMR. <br />15. Environmental Services beyond preparation and submission of a Categorical Exclusion <br />16. Sludge Management Plan <br />17. Warranty Assistance <br />18. Water Reuse Master Plan <br />19. Utility rate study <br />20. TMDL and NPDES permitting assistance <br />21. Water Conservation Plan <br />22. Drought Management Plan <br />23. Extra Meetings <br />24. Jar Testing Services <br />25. Sampling Services <br />Extra Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner <br />and Garver. <br />Appendix A - Scope of Services 7 of 8 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.