Laserfiche WebLink
• New administration building. <br />• Foul air facilities for the headworks area. <br />• Rehabilitation of the influent line from the WWTP to the flow equalization basin <br />(approximately 3.3 miles). This will include pipeline plan and section drawings for this route <br />within the existing easements. <br />1. Funding Assistance <br />Garver will assist the Owner during the design phase with the pursuit of funding through one funding <br />source, the Texas Water Development Board (TWDB). Garver cannot guarantee that funding for this <br />project will be available or that the Owner will be successful in qualifying for such. <br />Garver will perform the following tasks: <br />• Coordinate with the Texas Water Development Board via telephone as needed for project <br />updates. <br />• Provide design deliverables to the TWDB at each phase. <br />• Provide engineering documents needed for loan closure such as useful life certificate. <br />• Coordinate bid documents with TWDB to provide program compliance. <br />2. Surveys <br />2.1. Boundary Survey <br />Garver will perform a boundary survey with metes and bounds description for the land on which the <br />City of Paris wastewater treatment plant is located, along with easement boundaries for the WWfP <br />access road from US Hwy 271 into the WWTP. <br />2.2. Pipeline Easement Survey and Documents <br />Garver will perform a topographic survey at 50 ft contours along the existing influent force main easement <br />and the gravity portion from the existing WWTP site to the peak flow basin. This survey will assume a 100 <br />ft survey width. The survey will include a centerline on the existing pipeline easement and denote cross <br />sections of creeks, significant grade breaks, as well as any features such as culverts, fences, and tree <br />lines. <br />Records research for the alignment to located recorded easement documents will be conducted. The <br />descriptions will be located, plotted, and easements tied to the survey document. <br />If any additional geotech is needed, Garver will notify the Owner to acquire the additional geotechnical <br />boring and reports. <br />K <br />Garver will prepare and submit a request for a Categorical Exclusion (CE) to the TWDB. This includes a <br />detailed request to the TWDB, justification for the CE, and a copy of the Preliminary Engineering Report. <br />Garver's Environmental Services do not include an Environmental Information Document (EID). Should <br />the CE not be granted, and an EID be required by the TWDB, an amendment to this contract will be <br />necessary to prepare an EID, as shown in Section 7, Extra Work. <br />Garver will also conduct wetland delineation and conduct USACE coordination for the anticipated river <br />crossings along the influent pipeline alignment. A Nationwide 404 permit is anticipated and the effort to <br />submit the Nationwide 404 Permit request is included with this scope. <br />Appendix A - Scope of Services 2 of 8 <br />City of Paris WWTP Improvements <br />