27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
07 - JULY
>
July 27
>
27 - Wastewater Treatment Plant Rehabilitation - presentation and contract amendment one
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 10:12:25 AM
Creation date
7/24/2020 9:45:42 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garver will perform the following tasks: <br />Complete TWDB "Categorical Exclusion/Determination of No Effect Request Form' and <br />submit to the TWDB <br />Complete Nationwide 404 Permit application <br />The preliminary design phase will represent approximately 30 percent of final construction documents. <br />The preliminary design phase submittal will include a submittal of preliminary plans and an opinion of <br />probable construction cost. This submittal will not include technical specifications or "front end" <br />contract documents. Garver will not begin final design until the preliminary design is approved by the <br />Owner in writing. Preliminary design will include: <br />1. Process Design Criteria <br />2. Opinion of Probable Construction Cost — Preliminary Design Phase (OPCC) <br />3. Preliminary Drawings <br />4. Equipment Data Sheets and Manufacturer Information <br />Garver will perform the following project coordination tasks: <br />• Advise Owner as to the necessity of Owner providing data or services that are not part of <br />Garver's Basic Services. <br />• Maintain an overall schedule for the project and routinely advise the Owner of critical path items <br />affecting project progress versus schedule. <br />• Maintain and monitor project budget and submit monthly invoices based on progress of work <br />to date. <br />• Conduct six teleconference progress meetings with Owner's staff. <br />• Provide an agenda in advance of all scheduled meetings and provide subsequent meeting <br />minutes. <br />Process design criteria will be documented to identify basis of unit sizing and verification of <br />TCEQ regulatory conformance with the existing NPDES permit. <br />The cost opinion will update the City of Paris WWTP Improvements' conceptual estimate of <br />construction costs for project components based on information obtained during the preliminary <br />design phase. <br />Garver anticipates the preliminary design drawings will include a site plan, yard piping plan, <br />hydraulic profile, demolition details, preliminary process and instrumentation diagrams (P&IDs), <br />preliminary layouts of the proposed improvements such as liquid treatment process units and solids <br />treatment process units, associated equipment, major piping and valves, and preliminary electrical <br />one -line diagrams. <br />A Preliminary Design Document will detail the following: <br />• Process Design Criteria. <br />• Opinion of Probable Construction Costs. <br />• Equipment Data Sheets and Manufacturer Information. <br />• Specification Outline. <br />• Piping Schedule. <br />• Construction Sequencing. <br />• Control Descriptions "Draft' Specifications. <br />• Major Equipment "Draft" Specifications. <br />• Motorized Valve and Gate "Draft" Schedules <br />Appendix A - Scope of Services 3 of 8 <br />City of Paris WWTP Improvements <br />