Laserfiche WebLink
STREET SHARED STREE"T SCOPE <br />A 1111� 11 <br />MUM, <br />rr MM F-11 M.- <br />SCOI���'E OF IN11)"IRK <br />July 17, 2020 <br />The City (Cheri and Carla) and Toole Design (Ian and Chris) held a conference call to discuss advancement of <br />the I"' Street design. Based on the Visioning Paris Workshop, which Toole Design led with the City, 181 Street is <br />to become a shared street for a one block segment - Lamar Avenue to Clarksville Street. The City has asked <br />Ti,ille Aesi,16 ti, cre2te 2 siffi�fle scMmatic tesiS6 tNat C2A �,e �,,Yilt vi�A t�e ?,ssistai5ceiif a s;% -.K, wall-�y.alifie4 <br />contractor. <br />0XIMMMMI't" -r I VfM <br />with the City of Paris, an on-site visit, and desktop review of existing conditions. The specified study limits of this <br />scope of work is approximately 240 linear feet along 10 Street from Lamar Avenue to Clarksville Street. <br />Task I ,­ Coiricept Design <br />survey to develop two hand rendered alternative concept designs of 1 81 Street. The concept designs will be <br />illustrative in nature and accompanied with precedent imagery to help inform the design. It is understood that <br />dg <br />inverted crown to allow water to continue to sheet flow across the street. <br />The hand rendered concept designs will be presented through a virtual meeting online platform with video and <br />screen share capability. At the conclusion of the meeting, the City of Paris will select one concept design to move <br />forward. <br />I 1")eUveneblez": <br />