My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Toole Design Group for conceptual design of 1st Street SE from Lamar to Clarksville Street
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
08 - AUGUST
>
August 24
>
11 - Contract with Toole Design Group for conceptual design of 1st Street SE from Lamar to Clarksville Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 2:47:00 PM
Creation date
8/20/2020 2:39:10 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I S If R1 ET S 1,i A R E D S T 11 iEI' S C 0 PIF <br />Task 2,-- Schetriallic Design <br />Based on the preferred concept design, Toole Design will develop a schematic design for the 1 6� Street shared <br />street. The schematic design will provide a sufficient amount of detail for a capable, well-qualified contractor to <br />construct. The schematic design will include one (1) typical section, one (1) plan view, and up to two (2) sheets of <br />pertinent paving details and/or elevation drawings. The plan view will show general callouts, dimensions, <br />pertinent spot elevations using centerline elevations, and material callouts. The schematic design is not intended <br />to be full engineering drawings, Therefore, the schematic design plans will not be sealed by a professional <br />engineer. The intent is to provide enough detail for a contractor to move forward with construction with the City <br />providing oversight. At completion, Toole Design will present the schematic design through a virtual meeting <br />online platform with video and screen share capability. Following the receipt of a single unified list of comments <br />on the schematic design, in electronic format, Toole Design will make necessary revisions and resubmit to the <br />City. Multiple iterations and revisions will not be performed. <br />7"ask 2 <br />• One (1) Typical Section. <br />• One (1) Plan View Sheet. <br />•Up to (2) Sheets of Pavement Details and/or Elevation Graphics. <br />•One (1) Virtual presentation with staff. <br />•One (1) Revision. <br />IM <br />MOT 01911 F.0 �* . <br />Task 3 Photo Sinitflaflon <br />To gain momentum and support for the conversion of 151 Street into a shared street, Toole Design will create one <br />high resolution before and after photo simulation of the schematic design for marketing purposes, <br />Task Fee <br />Task 1 Concept Design $3,000.00 <br />Task 2 Schematic Design $8,600.00 <br />Task 3 Photo Simulation $2,000.00 <br />Total Lump Sum Cost* $13,600.00 <br />Lump sum cost is inclusive of labor, overhead, profit, and expenses. <br />Assumpt,firms arid Additloiiial Seivices <br />The following services are not included in the scope of services but can be provided as additional services if <br />authorized by the City of Paris. Compensation for additional services will be agreed upon prior to performance <br />
The URL can be used to link to this page
Your browser does not support the video tag.