STERLING <br />• Create DAS and Server connection diagram <br />■ Work with On -Site resource to rack and stack DAS devices <br />■ Work with On -Site resource to connect DAS devices to servers <br />■ Work with On -Site resource to properly configure uplink ports <br />• Configure DAS devices to participate in Windows Cluster <br />2.1.8 Configure Dell DD3300 Backup Devices (DR) <br />• Create DataDomain and Switch connection diagram <br />■ Work with On -Site resource to rack and stack DataDomain devices <br />■ Work with On -Site resource to connect DataDomain devices to switches <br />■ Work with On -Site resource to properly configure uplink ports <br />2.1.9 Configure Dell Avamar Backup Software (DR) <br />• Verify version of AVE to be deployed, ensuring compatibility with DDOS version. <br />a If necessary, upgrade DDOS to supported version for AVE. <br />• Download and deploy Avamar virtual appliance file in Hyper -V manager <br />• Install and configure Avamar software on VM <br />• Connect DataDomain storage to AVE <br />• Configure Avamar backup jobs <br />• Configure backup schedules and policies <br />• Perform full backup of DR environment <br />2.1.10 Configure Hyper -V Replication <br />• Configure each Hyper -V virtual machine for replication to DR <br />• Fully replicate all Hyper-VVMs to the DR side <br />2.1.11 Test Hype r -V Failover(Prod -> DR) <br />• Shutdown Production Hyper-VVMs and turn on the replica partners in DR <br />• Validate that all applications and data is working in DR <br />• Complete Testing <br />2.1.12 Test Hyper -V Failback (DR -> Prod) <br />• Shutdown DR Hyper-VVMs and turn on the replica partners in Production <br />• Validate that all applications and data is working in Production <br />2.1.13 Project Deliverables <br />Visio wiring diagram <br />Working Hyper -V Production site <br />Working Hyper -V DR site <br />2.1.14 Project Close Outand Documentation <br />• Deliver project deliverables referred to in the deliverables section of this SOW. <br />• Project closeout call. <br />• Customer signs project Customer Acceptance Form (CAF) <br />2.2 Sterling will perform the following Project Management activities during the term of <br />this SOW: <br />• Single point of contact and accountability for successful delivery of the Services <br />%, www.sterlingcompikers.com <br />