Laserfiche WebLink
w� <br />s <br />Elmhurst Road 60" & 90" Relocation and Hot Tap <br />0 <br />6o- <br />or <br />Illinois State Toll Highway Authority <br />(2,900 LF) <br />1-90 JAWA 48" and 36" Watermain Relocation <br />Illinois State Toll Highway Authority <br />_www. _ ................e <br />(6.5 mi) <br />.-.�-- <br />......_ <br />Wacker Drive Design Reconstruction <br />0 <br />0 <br />0 <br />0 <br />0 <br />City of Chicago DOT <br />(6,800 LF) <br />(9,900 LF) <br />......... ........_ <br />..................... ....... ._ <br />Red Gate Road Bridge <br />16 <br />0 <br />mt <br />sv <br />City of St. Charles <br />NNN _._.Wu__.uu, <br />(4,400 LF) <br />.0w <br />(4,300 LF) <br />Rollins Road Gateway <br />t, <br />Lake County DOT (Round Lake Beach, IL) <br />(3,100 LF) <br />Fairchild Street Overpass <br />0 <br />City of Danville <br />(2,758 LF) <br />130th St. & Torrence Ave. Grade Separation <br />5" <br />0, <br />mfr <br />0,, <br />0 <br />mt <br />City of Chicago DOT <br />(3,700 LF) <br />(12,400 LF) <br />Butterfield Road Reconstruction <br />0 <br />0 <br />0 <br />5a <br />Illinois DOT (City of Wheaton, IL) <br />(7,000 LF) <br />(3,500 LF) <br />Myer Street Watermain <br />0 <br />r <br />Aqua Illinois (City of Danville, IL) <br />(360 LF) <br />May Street Watermain <br />110 <br />Aqua Illinois (City of Danville, 1L) <br />(3,440 LF) <br />Damen, Elston, Fullerton Intersection Reroute <br />OF <br />01 <br />0 <br />"F <br />City of Chicago DOT <br />(2,971 LF) <br />(4,042 LF) <br />......... <br />......... __ ..... <br />.....w... <br />1-290 Main Drain Repairs <br />1n <br />lip <br />0 <br />0Illinois <br />DOT (Chicago) <br />(63,600 LF) <br />Hydraulic Modeling <br />Village of Lombard <br />073 mi) <br />Bussee and Greeleaf Lining <br />0 <br />0 <br />Village of Elk Grove <br />(285 LF) <br />Task Order #13-1 Sewer Design <br />orr <br />r(Ia5 <br />is <br />Chicago Dept. of Water Management <br />LF) <br />Task Order #13-9 Sewer Design <br />�t^ <br />Chicago Dept. of Water Management <br />(8,564 LF) <br />Task Order #14-13 Sewer Design <br />0 <br />0 <br />0 <br />Chicago Dept. of Water Management <br />(10,995 LF) <br />. ......-..__ <br />Task Order #14-18 Sewer Design <br />0 <br />116° <br />t'r <br />mr <br />Chicago Dept. of Water Management <br />(3,814 LF) <br />Task Order #15-8 Sewer Design <br />jut <br />0 <br />0 <br />Chicago Dept. of Water Management <br />(8,554 LF) <br />Task Order #16-1 Sewer Design <br />mit <br />0 <br />0 <br />Chicago Dept. of Water Management <br />- ........ <br />........ <br />............ _ <br />........... <br />... �..... <br />(11,950 LF) <br />...._. <br />... ..... <br />.............. <br />Galeton Borough Authority <br />IV <br />Water Distribution Improvements <br />(3,900 LF) <br />Hegins-Hubley Authority <br />0 <br />Waterline Improvements <br />(16,000 LF) <br />.._._.... _ ..�.._.... <br />Mahanoy Township <br />0 <br />0 <br />_�. <br />Water Distribution System Upgrades <br />(21,000 LF) <br />Laporte Borough Public Water System 0 <br />Water Distribution System Improvements (9.800 LF) <br />Hazle Hurst Water Company 0u <br />Water Distribution Improvement (16,000 LF) <br />. ......... ...................... _---------- ._. _- _......__._ .......... <br />rA benesch <br />