My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Unit Prices. <br />4. Deductions for defective work that has been accepted by the OWNER <br />Penalties and bonuses. <br />.. Deductions for liquidated damages. <br />6. Deductions for re -inspection payments per Paragraph 1.04. <br />7. Other adjustments. <br />B. OWNER shall prepare a final Change Order, reflecting the approved adjustments to <br />the contract amount which have not been covered by previously approved Change <br />Orders. <br />C. Submit the final application for payment per the General Conditions, including the <br />final Change Order. <br />1.07 WARRANTIES. BONDS AND SERVICES AGREEMENTS <br />A. Provide warranties, bonds, and service agreements required by Section 01 33 00 - <br />Submittals or by the individual sections of the specifications. <br />B. The date for the start of warranties, bonds, and service agreements is established <br />per the General Conditions. <br />C. Compile warranties, bonds, and service agreements and review these documents for <br />compliance with the Contract Documents. <br />1. Each document is to be signed by the respective manufacturer, supplier, and <br />subcontractor. <br />2. Each document is to include: <br />a. The product or work item description. <br />b. The firm, with the name of the principal, address, and telephone <br />number. <br />C. Scope of warranty, bond or services agreement. <br />d. Date, duration, and expiration dale for each warranty bond and <br />service agreement. <br />e. Procedures to be followed in the event of a failure. <br />f. Specific instances that might invalidate the warranty or bond. <br />D. Submit two (2) copies of each document to the OWNER. <br />1. Submit duplicate sets. <br />2. Documents are to be submitted on 8-1/2"x 11" paper, punched for a <br />standard three-ring binder. <br />3. Submit each set in a commercial quality three-ring binder with a durable and <br />cleanable plastic cover. The title "Warranties, Bonds, and Services <br />Agreements", the project name and the name of the CONTRACTOR are to <br />be typed and affixed to the cover. <br />Ea Submit warranties, bond and services agreements: <br />1. At the time of final completion and before final payment. <br />2. Within 10 days after inspection and acceptance for equipment or <br />components placed in service during the progress of construction. <br />City of Paris, Texas 01 70 00 _ Page 3 of 4 Contract Closeout <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.