My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAI.., CONDITI(JINS <br />13. Contract Price --The moneys payable by OWAFR to <br />AR141CLE I - DEFINITIONS AND TERMINOLOGY CONTRACTOR for completion of the Work in accordance with the <br />Contract Downicrits as.Wed in the Agrcenient (subjtct to (he pro,. isions of <br />paragraph 1[ 03 in the cue of Unt i Price Work) <br />101 DefinedTermz <br />A Whenever used in the Contract Documents and printed with initial or <br />-Az-& APA? xv -lei <br />-A wqml 61Aes, -6m lizftf �Ajf'w 'A% -ve Ae 'S ixilw W�Ic% <br />Exe applicable to both the singular and plural (hereof <br />I Addenda --Written or graphic instruments issued prior to the <br />opening ofi3t(Is winch clai%,, correct, or change The Bidding Requirements <br />or the Contract Docurrieritq <br />2, Agreemert--The wrlitten instrument which is evidence of the <br />agreement between OWNER and CONTRACTOR covering the Work <br />3 Applicatio,,for Payment--1he form acceptable to ENGINEER <br />winch is to bc used by CONTRACTOR dunng the course ofthe Work in <br />requesting progrm or final paymeas and which is to be accompanied by <br />such supporting documentation as is required by the Contract Documents <br />4 Asbestos --Any material that contains more than one percent <br />asbestos and is friable or is relcasini; asbestos fibers into (he air above <br />current action levels established by the Ututed States Occupational Wety <br />and Health Administration <br />5 Bid --The rrer or proposal of & bidder submitted on the <br />prescribed if setting forth the prices for the Work to be performed <br />6, Bidding Documents --The Bidding Requirements and the <br />propasnil Coatrad Documents (mluding all Addc;nda issued prior to receipt <br />ofBids) <br />7, Bidding Requirernents-7be Advertisement or Invitation to Bid. <br />Instructions to Didders, Bid security fiorm, ifany. and the Bid form with any <br />supplements <br />8 Bondr-ftrformance and payment bonds and other instruments <br />ofsecurity. <br />9 Change Oer--A document recommended by ENGINEER <br />which is signed by CONTRACTOR and OWNER and authorizes an <br />INA;, M11 I <br />10. Claim -A dwaand of assertion by OWNER or CONTRACTOR <br />§, "iAo <br />Nil I <br />11. Contract -The calve and intcgi-AW written agreement between <br />the OWNER and CONTRACTOR concerning the Work, The Contract <br />supersedes prior negofiations, representations. or agreements. whether <br />written or oral. <br />12. Contract Documents --The Contract Documents establish the <br />the Effective Date ofthe Agrearrient Approved Shop Drawings and the <br />!"mggoiwik- <br />are Contract Documents. Files in electronic media forinat of text data, <br />graphics, and the like that. may be furnished by OVMER to <br />CON'l RACTOR are not Contact Documents <br />14 Contract Times-Ahc number of days or the dates stated in the <br />Agreement to (1) ;kcluevc Substantial Completion, and (hi) complete the <br />Work so [hat it is ready for Imal payment as evidenced by ENGINEFR's <br />written recommendation of final payment <br />15. C016RACIORZ17be individual or enliL) with whom OWNER <br />has entered into the Agreement <br />16 Cost afthe Iflork--See paragraph I 10 1 A for definition <br />17 i�rawing "at pan of the ConLract Nocuments prepared <br />AlFrive,i! �y ENQA,,ErR yap�wAlly L�e eV -Sit, jo <br />character or the Work to be performed bv CONTRAC I OR Sha <br />000. <br />tifthe two parties to sign and deliver <br />19. ENGINEER --`line individual or entity named as such in the <br />Agreement - <br />20 ENGR&AR's Consulrant--Aft individual or entity having a <br />contructwith ENGINEER to furnish sccs: as ENGINEER's independent <br />professional associate or consultant with respect to the project <br />21 Freld Order --A written order issued by ENGINEER which <br />requires minor changes in the Work but which does not involve a change in <br />the Contract Price or the Contract Times <br />_.'N.PW1WQ <br />No% <br />Lnf= <br />0 11 1 1 <br />1 H W I il 0 ! A I <br />W09010146W 11 ;"W"'' &UM <br />NU <br />.r%Z1xjtAr7N1h1La I —f !I If <br />persons or property exVosed thereto in conneLdo" with the Work, <br />24. Hazardous Waste.-Tbe term Hazardous Waste shall have <br />'11' fL --d Act (42 U <br />25. Laws and Regulations, Laws or Regulations Any and all <br />TA29,-rZ7ffA;9i62'A, r1`ji35,_-wt% cifao. "I 1r11ej12 if?ny axd <br />ail goveramentall 1ie% agencies, authoribies, and courts having <br />junAction. <br />26, Dens-CharM security interests, or encumbrances upon Proji ect <br />funds, real property, or personal property, <br />27. Milestone --A principal event specified in the Contract <br />Documents relating to an intermediate cornpic-Uon dale or time prior to <br />Substantial Completion ofall The Work. <br />28, Notice ofAvvrd-The written notice by OWNER to the appar4g] <br />29. Monce to Proceed --A writirn notice given by r <br />C-11TRACT11,fi)ing the date on which the Contract Times Va <br />•11 /viiti i. -moi mv'_,v�'M�ec r_41NW_kr_'r.j -9 S�Zll tax t& je-&-kic 177 <br />Wa&, under the Contract Documents. E <br />
The URL can be used to link to this page
Your browser does not support the video tag.