30 OWNER 'lite individual, entity, public body, or authority with
<br />whom CONTRACTOR has entered into the Agreement and for whom the
<br />Work is to be performed.
<br />31 Partial Utilization --Use by OWNER of a substantially
<br />completed part ofthe Work for the purpose for which it is mtended (or a
<br />related purpose) prior to Substanlial Completion of all the Work
<br />32 PCBs. -Polychlorinated biphenyls
<br />33 Petroleam••Petroleum, including crude oil or any taction
<br />thereof which is liquid at standard conditions of temperature and pressure
<br />(60 degrees Paliienhcrt and 14.7 pounds per square inch absolute), such as
<br />all, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil
<br />mixed with other tion -Hazardous \Vastc and crude oils.
<br />34. Project --'the total construction of which the Work to he
<br />performed under the Contract Documents may be the whole, or a part as
<br />may be indicated elsewhere in the Contract Documents
<br />izr .. rhe
<br />36 Radioactive Material --Source, special nuclear, or byproduct
<br />material as defined by the Atomic Energy Act of 1954 (42 tJI& Section
<br />2011 et seq.) as amended from time to time
<br />37, Resident ProjectRepresenlalme•-The authorized representative
<br />of ENGINEER who may be assigned to the Site or any part thereof
<br />38. Samples -.Physical examples of materials, equipment, or
<br />thatarc representative ofsome portion ofthe Work and which
<br />establish the standards try which such portion ofthe Work w111 be judged
<br />39 Shop Drawings 411 drawings, diagrams, illustrations,
<br />schedules, and other data or information whtch etre specifically prepared or
<br />assembled by or for CONTRACTOR and submitted by CONTRACT OR
<br />to illustrate some portion ofthe Work.
<br />40. Site --Lands or areas indicated in [lie Contrail Documents as
<br />being rumishcd by OWNER upon which the Work is to be performed,
<br />including rights-of-way and easements for amens thereto, and such other
<br />lands furnished by OWNER which are designated for the use of
<br />CONTRACTOR.
<br />41. Specifications --That part ofthe Contract Documents consisting
<br />ofwntltn technical descriptions of malerials, equipment, systems, standards,
<br />and wurkmarsho as applied to the Work and certain administrative details
<br />applicable thereto.
<br />42. Subcontractor—An individual or entity having a direct contract
<br />with CONTRACTOR or with arty, other Subcontractor for the performance
<br />of a part ofthe Work al the Site.
<br />43. Substantial Completion—lite time at which the Work (or a
<br />specified pud thereof) has progressed to the point where, in the opinion of
<br />ENGINEER, to Work (or a specified part thereof) is su@icienlly complete,
<br />in aiocardanne with tie Contract Documents, so that the Work (or a specified
<br />part thereof) can be utilized for the putposcs for which it is intended. The
<br />leans "substantially complete" and "substantially completed" as applied to
<br />0 or part of time Work refer to Substantial Completion thereof.
<br />44. Supplementary Conditions—That pari of the Contract
<br />Documents which amends or supplements lbese General Conditions.
<br />45. Supplier—A manufacturer, fabricator, supplier, distributor,
<br />materialman, or vendor having a direst contract with CONTRACTOR or
<br />with any Subcontractor to furnish materials or equipment to be incorporated
<br />in the Work by CONTRACTOR or any Subcontractor,
<br />46. Underground Facilities --All underground pipelines; conduits,
<br />duos, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities
<br />or attachments, and any encasements containing such facilities, including
<br />those that convey electricity, gases, steam, liquid petroleum products,
<br />telephone or otter communications, cable television, water, wastewater,
<br />storm water, other liquids or chemicals, or traffic or other control systems,
<br />47 UartPnce Work --Work to be paid for on tie basis of unit prices
<br />48 Mark --The entire completed construction or the various
<br />separately identifiable parts thereof required to be provided under the
<br />Contract Documents Work includes and is the result of performing or
<br />providing at labor, services, and documentation necessary to produce such
<br />coadruction, and furnishing, itesiAlhng, and incorporating all materials and
<br />equipment into such construction, all as required by the Contract Docu-
<br />ments
<br />49 Work Change Directrve--A written statement to
<br />CONTRACTOR issued on or after the Effective Date ofthe Agreement and
<br />signed by OWNER and recommended by ENGINEER ordering an addition,
<br />deletion, or revision in the Work, or respondingto ditferingor unforeseen
<br />s ubs iface orphysical conditions under which the Work is to be performed
<br />or to erncrgencies. A Wait Change Directive will not change the Contract
<br />Price or the Contrail Times but is evidence that the parties expect that the
<br />change ordered or documented by a Work Change Directive will be
<br />krzirporaled in a r,ubsequentiv issued Change Order following negotiations
<br />by the patties w to its effect, ifany, on the Contract Price or Contract Times
<br />50. Written Amendment -•A written statement modifying the
<br />Contrad Documents, �igncd by OWNER and CONTRACTOR on or after
<br />the Effective Date of the Agreement and normally daaluig with the
<br />nonemgineering or nontechnical rather than strictly condn,ction-related
<br />aspects ofthe Contract Documents
<br />102 Terminology
<br />A. Intent ofCerta,n Terms or Adjectives
<br />I , Wherever in the Contract Documents the terms "as all owed," "as
<br />approved," or terms of like effect or import are used, or the adjectives
<br />"reasonable," "suitable," "acceptable," "proper," 'satisfactory," or
<br />adjectives of like effect or import are used to describe an action or
<br />determination of ENGINEER as to the Work, it is intended that such action
<br />or dderminadon will be solely to evaluate, in general, the completed Work
<br />for compliance with the requirements of and information in LhL Contract
<br />Documents and conformance with the design concept of the completed
<br />Project as a functioning whole as shown or indicated m the Contract
<br />Documents (unless there is a spec statement indicating otherwise) The
<br />use of any such term or adjective shall not be effective to assign to F.NGI-
<br />NEER any duty or authority to supervise or direct the performance ofthe
<br />Work or any duty or authority to undertake responsibility contrary to the
<br />provisions of paragraph 9. 10 or any other provision of the Contract
<br />Documents
<br />B. Day
<br />L, The word "day" shall constitute a calendar day of 24 hours
<br />measured from midnight to the next midnighL
<br />C Defective
<br />I , The word "defalive," when modifying the word "Work," refers
<br />to Work that is unsatisfidary. faulty, or deficient in that it docs not conform
<br />to the Contract Documents or does net meet the requirements of any
<br />inspection, reference standard, test, or approval referred to in the Contract
<br />Documents, or has been damaged prior to ENGINEER'S recommendation
<br />of final payment (unless responsibility for the protection thereof has been
<br />assumed by OWNER at Substantial Completion in accordance with
<br />paragraph 14 04 or 14.05).
<br />D, Furnish. Install, Perform, Provide
<br />1. The word " Rirriish," when used in connection with services,
<br />materials, or equipment, shall mean to supply and deliver said services,
<br />malmials, or equipment to the Site (or some other specified location) ready
<br />for use or installation and in usable or operable condition.
<br />2- The word `install." when used in connection with services,
<br />materials, arequifirwat, shall mean to put into use or place in fuel position
<br />said serum, materials, or equipment complete and ready for intended use.
<br />3. The words "perform' or "provide," when used in connection
<br />with services, malaials, or equipment, shall mean to furnish and instal said
<br />selviors, materials, or equipment complete and ready for intended use.