Laserfiche WebLink
4 When ­furruslj�" "install," "peorm," or '-provid,z" is not used <br />tn connection with services, materials, or c�quiprrrent. in a context clearly <br />requirutig an obligation ofCONTRAC I OR, "provide." is implied. <br />F UnIms &uled otherwise in the Contract D1cuments. words or phi ascs <br />201 Delivery ofBonds <br />A. When CONTRACTOR deh,.as The executed Agretments to OWNER, <br />NeM MON. <br />szmm��� <br />A, OWNER shall firrimb to CONTRACTOR up to ten five copies of the <br />Contract Documents Additional copies will be fitruished upon requestat the <br />cost ofireproduction <br />203 trimmencernant of Confracl 7imes. Notice to Proceed <br />OWN . =illl-Iopi NONNOWN <br />t% }c" <br />204 Startnig the Work <br />CONTRACTORkhastartto Perform The Work on the date when the <br />ContraictTuires comincow to nut. No Work shall be done at the Site Prior U)-�k <br />date an which the Contract Times commerce 10 run <br />1,' f,.., <br />A. COV77RACTOR's Review of Contract Docmments,,' Before <br />and all applicable ield measuremcnis. CONTRACTOR shall prompitly report <br />B Preliminary Schedules: Within ten days Itilefthie EffedivI-Ditte0f <br />the Agreement (on[= otherwise specified in the General Requirements), <br />CONTRACTOR &1W submit to ENGMER for its timely review - <br />1, a preliminary progrcss scheilule Indicating the times (Dumber$ Of' <br />days or dates) for starting and completing the various slages of the Work, <br />incluI ing, any Milestones specified in the Contract Documents, <br />I a preluninary schedule ofShop Drawing and Sample submittals <br />which will list caeb required submittal and the times for submitting, <br />reviewing, and proctssing such submiuma-, and <br />3 a preliminary schedule of values for all of ffic Work which <br />includes quantities and prices ofitems; which when added together equal the <br />Contract, Price and subdivides the Work into compontnt parts in suiticient <br />dotaiii to servi: as the basis for progress payments during perfirrmanco of the <br />Work. Such pnees wW include an appropriatearnountofoverhea <br />profit applivable to earb item of WorL <br />C, Evidenreaffrinerance: <br />which CON'i RAC I ORis required to purchase <br />and marritam, in accordance with Article 5 <br />2,66 Preconstruchor? Conference <br />A <br />A 1,LU)".,truction conference will <br />be arranged to t.%Iablj,;h a working undLYStAnding among 018 Pant"S as to the <br />Work and to discuss the schedules referred to in paragrapK 2,05.8, procedures <br />for handling Shop Drawings and other subrrultals, processing Applications for <br />Payment, and nwintAuung required records if re �otred bOWNE <br />ENGIN�EF R or CONI R ACTOR <br />_ <br />267 Inp tial Acceptance of Schedules <br />A Unless odmwlSir provided in the Contract Documents, at 'MA ten days <br />before subraLion ofthe first Application for Payment a conference attended by <br />CON`l`RACTOV4 ENGINEER, and others as appropnale will be held to review <br />for acceptability to ENGINEER as provided beloA the schedules subtrutted in <br />accordance with paragraph 2.01.8 CONTRACTOR shall have an additional <br />tien <br />days to make corrections and adjustments and to complete and resubmit the <br />sdicclulm. No progress payment shall be made to CONTRACTOR until <br />acceptable schedules are sub iced to ENGINEER - <br />I The progress schedule will be acceptable to ENGINEER if it <br />PT vides an orderly prrolgasion ofthe Work to completion within Any speci. <br />ficd&lxlr-lones.LridtlieCoottractTLmes Such acceptance will not impose <br />on ENGINEER responsibility for the progress schedule, for sequencing, <br />scheduling, or progress of the Work nor intcrftwe with or relieve <br />CONTRACTOR from CONTRACTOR's full responsibility therefor <br />2 CONTRACTOR's schedule of Shop Drawing and Sample <br />submittals will be acceptable to ENGINEER if it provides a workable <br />arrangement for I EVILWMg and processing the required subirrill.als <br />3 CONTRACTOWs schedule of values will be acceptable to <br />ENGINEER as to form and substance if it provides a reasonable allocation <br />ol'the Contract Price to component put% of di, Work. <br />A The Contract Documents are complementarry, what is called for by <br />one is as binding as if called for by all. <br />B It is the intent oftlip Contract Documents to describe a functionally <br />complete Project. (or put thecoi) to be c0astioJcted in accordance with the <br />Contract Documents. Any labor, documentation, s6rvicos, materials, Or equip - <br />merit that may reasonably be narred from the Contract. Documents or <br />ham prc%mTulg aistom or trade usage as bang required to produce the intended <br />resuftwin be provided whether or not specifically call ed for at no additional Post <br />to OWNER. <br />C, Clarifications and interpretations ofthe Contract Documents shall be <br />issued by ENGMER as provided in Article 9. <br />3.02 Reference Standards <br />A. Standards, Specifications, Codes, Lixwz, and Regulations <br />1. Rerenence to standards, specifications. manuals, or codes of any <br />-toIli, L <br />to L�mr <br />I. 'WIN <br />imp", N <br />'0 0 <br />11,610 1, <br />1 <br />'2No proviSiOn ofanysirah slaridard, specification, manual or code, <br />_jr)f I I I rm_or <br />