Laserfiche WebLink
direct the performance of the Work or any duty or authority to undertake <br />rcspon6bitit3, inconsistent with the provksion-q of the Contract Documents <br />A- Reporting Discrepancies <br />I if, during the perffirmancie of the Work, CONTRACTOR <br />disicovers any coafflict, error, ambiguity, or discrepancy %athin the Contract <br />Documents or between the Contract Documents and any provision of a* <br />Law or Regulation appy cable to the performance of the Work or or any <br />standard. slwcificaftou, Manual Or code. or of any insiruction of any <br />Suppliez, CONTRACTOR shall report itto ENGINEER in writing at once <br />CONITRACI OR shall not rroceed with the Work affccued thereby (except <br />in an emergency as required by paragraph 6 16A) until an amendment or <br />supplement to the Contract Documents has been issued by one of the <br />methods indicated in paragraph 3.04, provided, however, that <br />CONTP,A,CTORsW not be liable to OWNER or ENGINEER for failure <br />10 report any such ecI error, ambiguity, or di%crLpioicv unless CON- <br />MkICTOR knew or reasonablyshould have known thereof <br />1. Except as may be otherwise specifically stated in the Contract <br />L100,0T.M%-, the provisions of the Contract Documents shall take precedence <br />in resolving any conflict, error, ambiguity. or discrepancy between the <br />provisions of the Contract Documents and. <br />a the; provisions ofany standard, specification, manual. code, <br />Or instruction (whether or not specifically incorporated by reference in <br />the Contract Documents); or <br />b the provisions of any Laws or Regulations applicable to <br />the performance of the Work (unless such an interpretation of the <br />prnvi,olis ofthe CbralactDocumcnit; would result in violation of such <br />law or Regulation) <br />MMENIZEM <br />k The Contract Documents may be amended to provide for additions, <br />'14 rR di aw*a-cof <br />K11 AA -C Ir fIULG III <br />'Ayder, or (iii) a Work Change Directive, <br />B. lie requirements cifibe Contract Documents may be supplmeme,3, <br />03MMEMEMM= <br />A. CONTRACTOR and any Subcontractor or Supplier or other <br />viduad or entity performing or furvishing any of the Work under a direct or <br />indirect contract with OWNER (L) shall not have or acquire any title to or <br />ownership rights in any ofthe Drawings, Specifimtions, oro documents (or <br />copies of any thereof) prtlinured by or bearing the scW of ENGMEER or <br />ENG(NEER's Consultant recludingel ectronic media editions; and (n) "I not <br />must any ofsuch Drawings, Specifications, other documents, or copies thereof <br />onextensions of the Project or any other project Without writlisn cOnswi Of <br />OWNER and ENGINEER and specific written verificidion or adaption by <br />ENGINEER, This prohibition will survive ficial payment, completion, and <br />acceptance ofthe Work, or termination or completion ofthe Coattila NGdtmg <br />herein shall preclude CONTRACTOR from retaining copies of the Contract <br />Documents for record purposes. <br />4.01 Avallabilify OfLaffas <br />A. OWNER slid furnish the Site. OWNER shd no* <br />R.4 I "M 011 <br />I M i I <br />tooronthe amount or extent. if any, OfIJIIYAUstment in the Contract PrIct Of <br />Contract TinI orb as a result of any delay in OWNFR's furnishing the <br />Site, CONT RACI OR may make a Claim therefor as provided in paragraph <br />1005 <br />B Upon reasonable written request, OWNER shall furnish CON- <br />IRACTOR with acurrentgatcmeet ofrecord legal 1111C and ]Lgal description Of <br />the lands upon %tiich the Work isto be peirfiormed and OWNER's Interest thercin <br />as necessary for giving notice of or filing a mecharuc's or construction lien <br />against such lan& in accordance with appliLable Laws and Regulations. <br />C CONTRACTOR shall provide for all additional lands and access <br />thereto that may be required for toary construction facilities or storage Of <br />materials and equipment <br />A Repori`3 and Drawings: TheSupplenientaryCoigtilions)dentify <br />I those reports of explor-autins and tests ofsubsutface conditions <br />at orcontiguous to the Site that ENGFNEER has used in prepanng the <br />Contract Documents; and <br />2 dxm drawings ofphysical renditions in or relating to eXiSt-9 <br />surface or subsurface structures At or contiguous 10 the 'Rite (except <br />IFIV, <br />ivi-fv *e Contract <br />1. <br />B. LimatedRanwe&yCOArn?AC7'OR017Techi?tculDara.4,trhoFzed, <br />L the completeness of such reports and drawings for <br />CO OR's purposts, mclu but. not limited to, any mlieetis ofthe <br />means, method% techniques, sequences, and procedures of,;0oAM0Uon to <br />be employed by CONTIR ALCTOP, and safety priecautions and progrium <br />incident thereto; or <br />2, other data, interpretattorIs, opinions, and information contained <br />in such reports or she or indicated in such drawinp; or <br />3, any CONTRACTOR interpretation of or conclusion drawn from <br />any "technical data" or any such other data, interpretations, Opinions, Or <br />informattorL <br />4tO3 Affenrig Subtstrface or Phyncol Conditions <br />A. Notice. If CONTRACTOR befieves that any subsurface or physical <br />condition at or contiguous to the Site that is uncovured or revealed cithev <br />M <br />materially inaccurate; or <br />2. is ofsuch a nature as to require a change in the Contract Do-- <br />ments; or <br />3 differs majerially from thai shown or indicated in the Conti <br />Documents: or <br />4 is Oran unusual natum, and differs materially from coudiii <br />ondmardy encountered and gr <br />.ne,ally recogni=d as inherent in work of <br />character provided for in the Contract Documentir, <br />B, EiCURVEER'sRaview: A& -r receipt ofwrittee notice as required by <br />................... <br />