Laserfiche WebLink
deleffrime the necessity ofOWNER's oht,aining additional exploration of tests <br />with respedtheredo, and advL�: OWNER in writing (with a copy to CONTRAC- <br />TOR) of FNGTNEER's findings and conclusions <br />I The Contract Price or the Contract Times, or both, will he <br />equitably adjusted to the extent that the existence of such differing <br />subsurface or physical condition causes an increase or decrease in <br />CONTRACTOR `s cost of, or time required for, performance of Work, <br />subject, however, to the fallowing: <br />8- such condition must meet anyone or more of the categories <br />described in paragraph 4.03 A, and <br />b s, i1h respect io Work that is paid for on a Unit Price Basis, <br />any adjugment in Contract Price will be subject to the provisions of <br />paragraphs 9 09 and 1103 <br />2 CONTRACTOR shall not be entitled to any adjustment in the <br />Contract Price or Contract Times if, <br />A. CONTRACTOR knew of the eylstence of such conditions <br />at the time CONULACTOR made a final commitment to OWNER in <br />respect of Contract Price and Contract Times by the submission of <br />Bid or becoming bound under a negotiated contract, or <br />b the emunce ofsuch condition could reasonably have been <br />discovered or revealed as a result ofany examination, investigation, <br />explomlion, itst, orstudy of Site and contiguous areas required by <br />the Bidding Requirements or Contract Documents to be conducted by <br />or for CONTRACTOR prior to CONTRACTOR's making such fmal <br />commitment, or <br />c C014TRACTOR riuled to give the writien notice within the <br />time and as required by paragraph 4,03 A <br />3 if OWNER and CONTRACTOR are unable to agree on <br />entitlement to or on the amount or extent, ifany, of any adjustment in the <br />Contract Price or Contract Times, or both, a Claim may b,; made therefor as <br />Provided in paragraph 10.05. However, OWNER. ENGINEER, and <br />ENGINERR's Consultants shall not be liable to CONTRACTOR for any <br />claims, cow, lossez;, or damages (including but not limited to all fees and <br />charges of engineers, architects, attorneys, and other professionals and aU <br />court or arbitration or other dispute resolution costs) sustained by <br />CONTRACTOR on or in connection with any other project or anticipated <br />project <br />404 Underground Facilities <br />A. Shom orindrcated, The info lion and data shown or indicated in <br />the Contract Documents with respect to existing Underground Facilities at or <br />conligaous to the Site is based on information and data furnished to OWNER or <br />ENGINEER by the Own= ofsuch Underground Facilities, including OWNER, <br />or by others. Unless it is otherwise expressly provided in [be Supplementary <br />Conditions <br />1. OWNER and ENGINEER shall not be responsible for the <br />accuracy or completeness ofany such information or data-, and <br />2. the cod of all ofthe following will be included in the Contract <br />Prim and CONTRACTOR shall have full responsibility for: <br />a_ reviewing and checking all stich inrornialion and data, <br />b locating all Underground Facilities shown or indicated in <br />ft Contract Documents. <br />C. coordination of the Work With the owners Of such Un- <br />derground Facilities, including OWNER, during construWon, and <br />d. thesafety and protadion ofall such Underground Facilities <br />and repairing any damage thereto resulting from the Work <br />B Not Shown or Indicated <br />1. Ifan Underground Facility is uncovered or revealed at or coolig- <br />or indicated <br />MOM,. 111 . MIN; —011 mm I M OIL, cc, 10, 110 1, 000�_—0, 1 "I'M M <br />shA pyumpii,, after becoming aware thereof and before further disturbing <br />conditions affeLlou thereby or performing any Work in connection therewith <br />(except in an emergency as required by paragraph 6 16 A), identify the <br />owner of such Underground Facility and give wniten notice to that owner <br />and to OWNER and ENGINEER ENGINEER will promptly review the <br />Underground facility and determine the extent, if any, to which a change is <br />required in the Contract Documents to <br />During such Lune, CON TRAM OR shall be responsible for the safety and <br />protection of such Underground Facility J'he discoyer�Ftbesc.�ulifiiit-. <br />0 s <br />iall not be <br />LZoun& for additional compensafion_Additional time mai be <br />recommended by the ENGINEER if. in his opinion the work is unduly <br />delayed for resolution of the utility conflict, <br />to <br />um <br />405 Reference Points <br />A. OWNER shall provide engineering surveys to establish reference <br />pointsfor construction which in ENGINFLR's ixidgment are riccuv"xy to enable <br />CONTRACTOR to proceed with the Work. CONIRAC'FOR shall be <br />responsible for laying out the Work, shall protect and preserve the established <br />reference points and properly monuments, and shall make no changes or reloca- <br />tions without the prior written approval of OWNER. CONTRACTOR shall <br />mpairito ENGINEER wbeneverany reference point or property monument is log <br />or destroyed or require% relocation because of necessary changes in grades or <br />locations, and shall be responsible for the accurate replaotment or relocation of <br />such reference points or property monuments by professionally qualified <br />personnel. <br />406 Hazardous Environmental Condition at Site <br />A Reports and Drawings: Reference is made to the Supplementary <br />Conditions for the identification of those reports and drawings relating to a <br />Hazardous Envirumnerital Condition identified at the Site, ifany, that have bew <br />utilized by The ENGINEER in the preparation of the Contract Documents, <br />B. Limited Reliance by CORMACTOR on Technical Data Authorized,, <br />CONTRACTOR may rely upon the general accuracy ofthe "technical daW' <br />contained in such reports and drawings, but such reports and drawings are not <br />CrintradDocuments. Such "technical daW'is identified in the Supplementary <br />ConMom Exwpt. flir such reliance on such "technical dalii,"CONTRACTOR <br />may not rely upon or make any Claim against OWNER, ENGINEER or any of <br />ENGINEER's Consultants with respect to: <br />1. the completeness of such reports and drawings for <br />CO14TRACrOR's purposes. including but not firniled to, any aspects ofthe <br />ymmas, methods, techniVe&, sequences and procedures ofconstruction to be <br />employed by CONTRACTOR and safety precautions and programs incident <br />thereto; or <br />Z. other data, interpretations, opinions and information contained <br />in such reports or shown or indicated in such drawings'; or <br />3- any CONTRACTOR urterprttation of or conclusion drawnfrom. <br />any "technical data" or any such other data, interpretations, opinions or <br />information. <br />C, CONTRACTOR shall not be responsible for any Hazardous <br />Site which was not shown <br />0 MOO, <br />690 <br />CONTRACTOR is responsible. <br />111116g1 <br />