My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspections are only a periodic, cursory construction review, and the CONTRACTOR is solely <br />responsible for compliance with the Construction Documents. <br />SC 3.03 <br />Add the following language at the end of paragraph 3.03 of the General Conditions: <br />In case of conflict between the drawings and specifications, the specifications shall govern. Figure <br />dimensions on drawings shall govern over scale dimensions, and detailed drawings shall govern over <br />general drawings. <br />SC 4.02(A) <br />Add the following language at the end of paragraph 4.02(A) of the General Conditions: <br />The CONTRACTOR is hereby notified that the OWNER has not conducted subsurface soil <br />investigations within the area in which the project is to be constructed. It shall be the <br />CONTRACTOR'S sole responsibility to determine to his satisfaction the subsurface condition <br />of the soil. All excavation is considered incidental to the amount bid for other items, and <br />there shall be no additional allowance for rock excavation, or for unstable soils, if <br />encountered. <br />SC 4.03(A) <br />Add the following sentence at the end of paragraph 4.03(A): <br />Discovery of underground facilities at or contiguous to the site, which are not shown or indicated in <br />the Contract Documents, or which have been mislocated by their respective owners, shall not be <br />grounds for increase in the contract price, except that, for unit price contractors, payment shall be <br />adjusted for increased or decreased constructed units of the various bid items resulting from <br />realignment or rerouting, if said realignment or rerouting is deemed necessary by the ENGINEER. <br />SC 5.04 <br />The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall <br />provide coverage for not less than the following amounts or greater, where required by Laws and <br />Regulations: <br />Worker's Compensation <br />Statutory <br />Applicable Federal (e.g. Longshoreman's) <br />Statutory <br />Employer's Liability: <br />Bodily Injury by Accident or <br />Disease, each employee <br />$500,000 <br />Aggregate <br />$500,000 <br />Comprehensive Commercial General Liability: <br />Bodily Injury, including completed operations and products liability: <br />$1,000,000 <br />$2,000,000 <br />Each Occurrence <br />Annual Aggregate <br />City of Paris, Texas 00 73 00 Page 2 of 8 Supplemental Conditions <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.