Laserfiche WebLink
a. The final copy is to be signed by the representative of the <br />CONTRACTOR authorized to execute documents for the <br />CONTRACTOR and notarized. <br />The ENGINEER will review the payment request. <br />1.04 PAY ITEM DESCRIPTION AND MEASUREMENT <br />A. Bid Items listed in the Proposal along with the manner in which payment shall be <br />awarded for each item are specified in each individual technical specification. <br />Additionally, if there are bid items not covered in technical specifications, they have <br />been listed below. If there is not a bid item provided for work identified in the <br />Drawings or Specifications or for incidental work that is required to complete the <br />Project, it shall be understood to be subsidiary to construction, measurement and <br />payment of one of the below items or the individual bid items within the technical <br />specifications. <br />1. Bid Item 1 — Mobilization <br />The amount of a maximum of 5 percent of the Base Bid shall be full <br />compensation for all costs associated with mobilization, as well as for providing <br />all bonds required by the Contract Documents. This amount will be paid in full <br />following mobilization. <br />2. Bid Item 2 --- Ommitted <br />3. Bid Item 3 - Barricades, Signs and Traffic Handling <br />This per month bid shall be full compensation for the preparation, <br />implementation, installation, and maintenance of the traffic control plan and <br />corresponding devices as necessary to safely maintain the work area and access <br />to properties during this project. <br />4. Bid Item 4 — Remove and Dispose of Existing Concrete Bag Wall (19 LF) <br />This lump sum bid shall be full compensation for removal, disposal and cleanup <br />of an existing approximately 19 linear foot concrete bag wall in accordance with <br />the Drawings and Specifications, complete in place. This bid item shall include, <br />but not be limited to, all associated items for the removal, disposal and cleanup <br />of the existing concrete bag wall. <br />5. Bid Item 5 — Provide and Install Gabion Baskets, Stone, Geotextile Fabric, and <br />Associated Work <br />This cubic yard bid shall be full compensation for furnishing, installation, and <br />cleanup of gabion baskets, stone, geotextile fabric and associated work, <br />complete in place. This bid item shall be installed in accordance with the <br />drawings and specifications as well as the manufacture's recommendations. <br />This item shall include, but not be limited to, gabion baskets, stone, geotextile <br />fabric, foundation, anchoring, excavation, backfill, hauling and disposing of <br />excess material, and cleanup. <br />6. Bid Item 6 — Erosion Control (Rock Check Dam) <br />This lump sum bid shall be full compensation to install, maintain and remove rock <br />check dams in accordance with the drawings and specifications, complete and in <br />place. <br />T Bid Item 7 — Modification of Backyard Drain Pipes <br />City of Paris, Texas 01 22 13 -- Page 5 of 6 Measurement and Payment <br />9/10/2020 <br />