My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This unit price bid shall be full compensation for the modification of backyard <br />drain pipes as necessary to incorporate into the newly installed gabion basket <br />wall to ensure unimpeded, positive drainage into the channel. This shall be done <br />in accordance with the drawings and specifications, complete and in place. This <br />bid item shall include, but not be limited to, PVC pipe, pipe couplings, and <br />associated work. <br />8. Bid Item 8 — Repair, Regrading, and Sodding of Temporary Construction Access <br />Easement to Pre -Project Conditions <br />This lump sum bid shall be full compensation for the required repair, regrading, <br />and sodding of the temporary construction access easement to pre -project <br />conditions, complete and in place. This bid item shall include, but not be limited <br />to, repair of any damaged sprinkler system components, fill material, grading to <br />ensure no ponding and positive drainage to the channel, sodding (St. Augustin <br />grass) the disturbed area, and cleanup. <br />B. The following section describes additional items that shall be considered subsidiary <br />to Bid Items listed above. <br />No separate payment will be made for rock excavation, and the cost thereof shall <br />be included in unit price bid. The CONTRACTOR is responsible for damage <br />inside the permanent and temporary easement or other property outside the <br />easement, caused by his operation, and shall negotiate a settlement with the <br />landowner that will ensure that no claim will be filed against the OWNER. All <br />special easement requirements as listed on the Drawings or in the Specifications <br />shall be made incidental to this bid item. If an existing utility, sidewalk or structure <br />is damaged or must be relocated for construction, the cost of the repair or <br />relocation shall be borne by the CONTRACTOR. <br />C. The words "complete in place" shall mean the inclusion of the work, including <br />incidentals, mentioned or implied in the Specifications and on the Drawings, or work <br />that may reasonably be inferred as necessary to the proper execution of the item, <br />unless payment for any portion of the work is otherwise specifically provided for. <br />SECTIONEND OF <br />City of Paris, Texas 01 2213 Page 6 of 6 Measurement and Payment <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.