My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2020
>
12 - DECEMBER
>
December 14
>
11 - Contract with Bernal for 645 Johnso Woods Channel Bank Stablization Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:06:14 AM
Creation date
12/10/2020 9:49:16 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEcrm 01 33 00 <br />A. Submit documentation as required by the Contract Documents and as reasonably <br />requested by the OWNER and ENGINEER to: <br />1. Record the products incorporated into the Project for the OWNER. <br />2. Provide information for operation and maintenance of the Project. <br />3. Provide information for the administration of the Contract. <br />4. Allow the ENGINEER to advise the OWNER if products proposed for the <br />project by the CONTRACTOR conform, in general, to the design concepts of <br />the Contract Documents. <br />B. CONTRACTOR's responsibility for full compliance with the Contract Documents is not <br />relieved by the ENGINEER's review of submittals. Contract modifications may only be <br />approved by Change Order or Field Order. <br />1.02 CONTRACTOR'S RESPONSIBILITIES <br />A. Review all submittals prior to submission. <br />B. Determine and verify: <br />1. Field measurements. <br />2. Field construction requirements. <br />3. Location of all existing structures, utilities and equipment related to the <br />submittals. <br />4. Submittals are completed for their intended purpose. <br />5. Conflicts between the submittals related to the various Subcontractors and <br />Suppliers have been resolved. <br />6. Quantities and dimensions shown on the submittals. <br />C. Submit information per the procedures described in this Section and the detailed <br />specifications. <br />D. Furnish the following submittals: <br />1. Schedules, data and other documentation as described in detail in this Section <br />or referenced in the General Conditions. <br />2. Documentation required for the administration of the Contract per Section 01 <br />31 00 — Project Administration. <br />3. Shop Drawings required for consideration of a contract modification per <br />Paragraph 1.08. <br />4. Submittals as required in the Specifications. <br />5. Submittals not required will be returned without ENGINEER's review. <br />E. Submit a schedule indicating the date submittals will be sent to the ENGINEER and <br />proposed dates that the product will be incorporated into the project. Make submittals <br />promptly in accordance with the schedule so as to cause no delay in the Project. <br />City of Paris, Texas 01 33 00 — Page 1 of 11 Submittals <br />9/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.