1. Send submittals to the ENGINEER allowing a reasonable time for delivery, <br />review and marking submittals. Include time for review of a resubmission if <br />necessary. Allow adequate time for the submittal review process, ordering, <br />fabrication, and delivery of the product so as to not delay progress on the <br />Project. <br />2. Schedule submittal to provide all information for interrelated work at one time. <br />No review will be performed on submittals requiring coordination with other <br />submittals. ENGINEER will return submittals for resubmission as a complete <br />package. <br />F, Submit information for all of the components and related products required for a <br />complete and operational system in the same submittal. <br />1. If applicable, include electrical, mechanical, and other information required to <br />indicate how the various components of the system function. <br />2. Provide certifications, warranties, and written guarantees with the submittal <br />package for review when they are required. <br />G. Fabrication or installation of any products prior to the approval of Shop Drawings is <br />done at the CONTRACTOR's risk. Products not meeting the requirements of Contract <br />Documents are defective and may be rejected at the OWNER's option. <br />H. Payment will not be made for products for which submittals are required until the <br />submittals have been received. Payment will not be made for products for which Shop <br />Drawings or Samples are required until these are approved by the ENGINEER. <br />1.03 QUALITY ASSURANCE <br />A. Submit legible, accurate, complete documents presented in a clear, easily understood <br />manner. Submittals not meeting these criteria will be returned without review. <br />B. Demonstrate that the proposed products are in full and complete compliance with the <br />design criteria and requirements of the Contract Documents including Drawings and <br />Specifications as modified by Addenda, Field Orders, and Change Orders. <br />C. Furnish and install products that fully comply with the information included in the <br />submittal. <br />D. Review and approve submittals prior to submitting them to the ENGINEER for review. <br />Submittals will not be accepted from anyone other than the CONTRACTOR. <br />MiL1111111111IM�`1I1:3ky,Ira 1M:Ja01014bill 1"MI <br />A. Deliver three (3) hard copies of final approved submittals to the ENGINEER at the <br />following address unless otherwise stated at the pre -construction conference: <br />Carla Easton, City of Paris <br />1501s'SE <br />Paris, TX 75460 <br />ceaston@paristexas.gov <br />B. Transmit electronic copy of all preliminary submittal for ENGINEER's review and final <br />approved submittal to the following email address. The complete contents of each <br />submittal, including associated drawings product data, etc., shall be submitted in <br />Adobe Acrobat PDF format, or other format approved by ENGINEER. <br />Email: ceaston@paristexas.gov <br />C. Transmit all submittals, with a properly completed Submittal Transmittal Form. <br />1. Use a separate transmittal form for each specific product, class of material, <br />and equipment system. <br />City of Paris, Texas 01 33 00 — Page 2 of 11 Submittals <br />9/10/2020 <br />