Laserfiche WebLink
1. Provide a log of all products for which warranties or guarantees are provided, <br />and for all equipment. Index the log by Specification Section number on forms <br />provided by the ENGINEER. <br />2. Indicate the start date, warranty or guarantee period and the date upon which <br />the Warranty or guarantee expires for product or equipment which a warranty <br />or guarantee is required. <br />3. Indicate the date for the start of the correction period specified in the General <br />Conditions for each piece of equipment and the date on which the specified <br />correction period expires. <br />4. Provide a copy of the warrantee or guarantee under a tab indexed to the log. <br />111 u 0 , 3T1.._3`4�l Rmbi] <br />A. Make all corrections or changes in the submittals required by the ENGINEER and <br />resubmit until approved. <br />B. For shop drawings: <br />1. Revise initial drawings or data and resubmit as specified for the original <br />submittal. <br />2. Highlight in yellow those revisions which have been made in response to the <br />first review by the ENGINEER. <br />3. Highlight in blue any new revisions which have been made or additional details <br />of information that has been added since the previous review by the <br />ENGINEER. <br />C. For samples: Submit new samples as required for the initial sample. Remove samples <br />which have been rejected. <br />D. For mock-ups: Construct a new mock-up as initially required. Dispose of mock-ups <br />which have been rejected. Engineering cost for excessive review of shop drawings <br />will be paid by the CONTRACTOR. <br />1. Excessive review of shop drawings is defined as any review required after the <br />original review has been made and the first resubmittal has been checked to <br />see that corrections have been made. <br />2. Cost for additional review time will be billed to the OWNER by the ENGINEER <br />for the actual hours required for the review and marking of shop drawings by <br />ENGINEER. <br />3. Pay cost for the additional review to the OWNER on a monthly basis as billed <br />by the OWNER. <br />4. Need for more than one resubmission or any other delay of obtaining <br />ENGINEER's review of submittals, will not entitle the CONTRACTOR to an <br />extension of Contract Time. All costs associated with such delays shall be at <br />the CONTRACTOR's expense. <br />1.11 PROCEDURES FOR APPLICATIONS FOR PAYMENT <br />A. Submit Applications for Payment and Schedule of Values per the procedures indicated in <br />Section 01 22 13 — Measurement and Payment. <br />B. Provide preconstruction videos per Section 01 31 00, Project Administration with each <br />Application for Payment. <br />1.12 ALTERNATES AND ALLOWANCES <br />A. Include amounts for specified Alternate Work in the Agreement. <br />City of Paris, Texas 01 33 00 — Page 10 of 11 Submittals <br />9/10/2020 <br />