Laserfiche WebLink
• Attend and participate in reporting recommendation of award to Owner Council. <br />• Prepare construction contracts. <br />• Prepare conformed documents (four half size sets). <br />• Distribute as required to State Agencies and Funding Agencies <br />7. Extra Work <br />The following items are not included under this agreement but will be considered as Extra Work. Extra <br />Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner and <br />the Engineer. <br />1. Construction Package 2 Bidding Services. <br />2. Construction Phase Engineering Services. <br />3. Construction Phase On-site Construction Management Services. <br />4. Construction materials testing. <br />5. Geotechnical services. <br />6. SSES, I&I analysis, and/or sewer system survey. <br />7. Design of improvements off-site aside from the influent pipeline. <br />8. Utility relocation coordination or design. <br />9. Hydraulics and hydrology for floodway No -Rise Certification and Individual 404 permit. <br />10. Redesign for the Owner's convenience or due to changed conditions after previous alternate <br />direction and/or approval. <br />11. Submittals or deliverables in addition to those listed herein. <br />12. Invasive structural evaluation techniques beyond visual observation of existing structures at <br />grade and existing record drawings. <br />13. Preparation of a Storm Water Pollution Prevention Plan (SWPPP). <br />14. Environmental Handling and Documentation beyond those previously identified, including <br />wetlands identification or mitigation plans or other work related to environmentally or <br />historically (culturally) significant items. <br />15. Floodplain delineation and coordination with FEMA and preparation/submittal of a CLOMR <br />and/or LOMR. <br />16. Environmental Services beyond preparation and submission of a Categorical Exclusion <br />17. Sludge Management Plan <br />18. Warranty Assistance <br />19. Water Reuse Master Plan <br />20. Utility rate study <br />21. TMDL and NPDES permitting assistance <br />22. Water Conservation Plan <br />23. Drought Management Plan <br />24. Extra Meetings <br />25. Jar Testing Services <br />26. Sampling Services <br />Extra Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner <br />and Garver. <br />Appendix A - Scope of Services 8 of 9 <br />City of Paris WWTP Improvements <br />