Laserfiche WebLink
<br />RESOLUTION NO. 87-077 <br /> <br />WHEREAS, the City Council of the City of Paris did <br />heretofore, in Resolution No. 86-001, award the contract for <br />construction of Additions to Water Treatment Plant to <br />Heritage Constructor's, Inc.; and, <br /> <br />WHEREAS, the Special Project Engineer, John Buss, <br />recommends the amendment of said contract by Change Order <br />No. 10 attached hereto as Exhibit "A", which provides for a <br />net increase in contract price of $27,926.18 to a total of <br />$3,168,559.57 for 36" transfer pipe modification, deducting <br />Dixon pressure recorder, addition of raw water metering <br />loop, elevated storage telemetry, power circuit to Doppler <br />compressor, deducting loading dock driveway, raising manhold <br />Ill/Add step, raising manhole #2, payment revision, limit <br />switch at ground storage, lime subgrade processing allow- <br />ance, filter block restocking allowance, deducting unused <br />Class A concrete, deducting unused Class C concrete, <br />deducting unsued crushed stone backfill, reimbursing 1/2 <br />Honeywell service charge, and modifying rapid mix basin, <br />NOW, THEREFORE, <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />PARIS, That the contract for Additions to the Water Treat- <br />ment Plant is hereby amended by Change Order No. 10 attached <br />hereto as Exhibit "A" and the Mayor of the City of Paris, <br />Billy Joe Burnett, is hereby authorized and directed, on <br />behalf of the City of Paris, to execute said Change Order. <br /> <br />Passed and adopted this 23rd day of July, 1987. <br /> <br />~,ke~,~P' <br /> <br />Bi e Burnett, Mayor <br /> <br />ATTEST: <br /> <br />, <br /> <br /> <br />~~1\~~~~~ <br /> <br />APPROVED <br /> <br /> <br />l.ty Attorney <br />