Laserfiche WebLink
<br />A. PREBID PHASE <br /> <br />1. Make necessary preliminary field studies and investigations, <br />and verify all drawings, descriptions, studies, and other data <br />supplied by the Owner for Engineer's use which, in the opinion <br />of the Engineer, are critical to the process and mechanical <br />design of the project, In addition to illl other necessary <br />field study and investigation, specific an~lysis shall be done <br />and a recommendation formulated based upon economy and ade- <br />quacy of service, 011 the following matters: <br /> <br />o The type of material and construction to be used in the <br />trickling filter wall. <br /> <br />o The type of ma teri a 1 and cons cruct i on to be used for the <br />screening building, <br /> <br />o The desirability, from a reliability standpoint, of using two <br />smaller screw conveyors for screening disposal, as opposed to <br />one large screw conveyor. <br /> <br />o The desirability and practicality of delaying the complete <br />installaticr, of all the aeration discs necessary to treat the <br />design load and instead sequentially adding aeration discs, as <br />necessary, to satisfy the oxygec requirements dS the facil ity <br />loading increases from current levEls to design capacity, <br />Engineer should reference dnd satisfy Article III, Section 3.3 <br />of the Merico/City of Paris, Wastewater Treatment AgreemEnt, <br />when conducting this analysis. <br /> <br />2. Prepare a basis of Design Memorandum which includes: <br /> <br />o A description of project concept and intended results, <br /> <br />o A general description of existing facilities and a more <br />detailed description of Ilew or modified facilities. For each <br />individual new or modified treatment unit, mechanical informa- <br />tion such as, but not limited to, dimensional size, volume, <br />aeration capacity and distribution, horsepower, equipment <br />model, manufacturer and performance requirements shall be <br />specified, as appropriate depending on the process unit under <br />consideration. <br /> <br />o Field information such as dimensions and elevations to exist- <br />ing facilities where critical, approximate dimensions, <br />locations and elevations of other new or existing facilities, <br /> <br />o Process design criteria for each individual treatment unit, <br />such as flow, detention time, recycle rates, relevant <br /> <br />A-2 <br /> <br />.............,,(l.,. <br />