My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - Final Plat - K&S Investments
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
06 - JUNE
>
June 27
>
10 - Final Plat - K&S Investments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 1:54:34 PM
Creation date
6/23/2022 1:54:26 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Per the City's Subdivision Ordinance, Section VIII. A, E7, and E14: The city hereby adopts the <br />master thoroughfare plan to provide for the location and size of thoroughfares in the city. The <br />streets of a proposed subdivision shall conform to the general intent of the approved <br />thoroughfare plan. The city shall have the authority to determine final alignment and right-of- <br />way requirements/The City shall have the authority to require proposed developments and <br />subdivisions to extend proposed residential streets and residential street right-of-way to <br />adjacent properties where future development or redevelopment is projected to occur./ <br />Collector streets shall have a minimum width of right-of-way of sixty (60) feet and a minimum <br />paving width of thirty-nine (39) feet, back of curb to back of curb. <br />a. Cherry St is designated as a collector street in the Master Thoroughfare Plan and as such <br />requires that ROW be dedicated to reach 30ft from centerline of the road. <br />RECCOMENDATION: Engineering staff recommends that the preliminary and final plat be denied based <br />on the nature and abundance of issues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.