Laserfiche WebLink
<br />~ <br />~ <br /> <br />CHANGE ORDER 4+ 1 <br /> <br />,_;i~'}; City of Paris <br /> <br />,;-:::.>. / P_O. GOX 1037 : PARIS, TEXAS 75450 <br /> <br />PROJECT TIT LE <br />PROJECT NO. <br /> <br />CONTRACTOR <br /> <br />WASTEWATER PUMPING STATION <br />85.20 <br /> <br />15-85-20-0341 <br /> <br />CDrnRACT DATE __.__~ <br /> <br />CONTRACT NO <br /> <br />,Johansson Construction COrTijJilJ1Y, Inc. <br /> <br />The follo\'/ing Ch31lGCS arc hereby rl1tlde 10 the Con;rJc; Documents: <br /> <br />CHANGE: TO COf,nr-\/\CT PRICE <br /> <br />$590,000.00 <br /> <br />Original Total Contract Price <br /> <br />Reduction in the Contract Price Due to <br />This Change Order <br /> <br />43,659.00 <br /> <br />New Total Contract Price Due to This Change <br />Ol-der fOl- Changes Desuibed in Attachlllent "A" <br /> <br />$545,341.00 <br /> <br />CH/\NGE TO cor\'Tr:;;\CT :I~'"H: <br /> <br />JUST! FICAT!ON <br /> <br />None <br /> <br />The changes descl-ibed in detail in Attachment "A" involve clal-ifications in the <br />contract documents and changes in the work which will reduce the Contract Price <br />while maintaining the utility and longevity of the facility. The chan0es involve <br />in summary: <br />1. <br />2. <br />3. <br />4. <br />5. <br />5. <br />7. <br /> <br />Requested by <br /> <br />Recommended by <br /> <br />Ordered by <br /> <br />Reduction of the instrumentation and control cost. <br />Changes in the sluice gate requirements. <br />Pipe and pipe fitting changes. <br />Changes in the building construction. <br />Deletion of the north meter vault and meter. <br />Allo\'ling reuse of the temporary bypass piping. <br />Clarification in the earthwork specifications. <br /> <br />Owner <br /> <br />date <br /> <br />U.:Jtc <br /> <br />Ron Pedersen, Staff Engineer <br /> <br />dJtc <br /> <br />Accepted by <br /> <br />George Fisher, Mayor <br />Johansson Construction Company, Inc. <br /> <br />date <br /> <br />Form 15.3 <br />