Laserfiche WebLink
<br />contract documents. Building details shall be as shown <br />on the Contractor's drawing dated October 9, 1985, and <br />as approved by the Engineer. <br /> <br />Deduction $ 7,000.00 <br /> <br />5. Delete Meter Vault and Meter: <br /> <br />Delete the meter vault and meter located north of the <br />pump station structure on the 18-inch pump discharge <br />force main, including: excavation, concrete, miscellaneous <br />metals, reducers, coupling, spool pieces, meter, conduit, <br />wiring, and recorder. Piping in this area shall be IS-inch <br />as specified for this service. <br /> <br />Deduction $22,711.00 <br /> <br />6. Reuse of Bypass Piping: <br /> <br />27-inch RCP pipe may be used for the temporary bypass <br />shown on the plans. Upon completion of the diversion <br />structure this piping may be re-installed as part of the <br />permanent work where such material is called for in the <br />Contract Documents. Re-used RCP pipe shall be subject <br />to inspection and all other provisions of the Contract <br />Documents. <br /> <br />Deduction $ 1,445.00 <br /> <br />Total Deduction for Items 1 through 6 <br /> <br />$43,659.00 <br /> <br />7. Earthwork: <br /> <br />Section 02200 <br /> <br />3.3, E. Change the last sentence of the last paragraph <br />to read: <br /> <br />"....a seal slab of concrete, or other method or <br />methods as approved by the Engineer, to prevent <br />significant desiccation of the clay." <br /> <br />3.7, B. Delete the entire second paragraph. <br /> <br />- 2 - <br />