My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-088-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 85-087, award the
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1985
>
1985-088-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 85-087, award the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:01 PM
Creation date
6/2/2005 10:33:13 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1985
Doc Type
Resolution
CITY CLERK - Date
10/14/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />contract documents. Building details shall be as shown <br />on the Contractor's drawing dated October 9, 1985, and <br />as approved by the Engineer. <br /> <br />Deduction $ 7,000.00 <br /> <br />5. Delete Meter Vault and Meter: <br /> <br />Delete the meter vault and meter located north of the <br />pump station structure on the 18-inch pump discharge <br />force main, including: excavation, concrete, miscellaneous <br />metals, reducers, coupling, spool pieces, meter, conduit, <br />wiring, and recorder. Piping in this area shall be IS-inch <br />as specified for this service. <br /> <br />Deduction $22,711.00 <br /> <br />6. Reuse of Bypass Piping: <br /> <br />27-inch RCP pipe may be used for the temporary bypass <br />shown on the plans. Upon completion of the diversion <br />structure this piping may be re-installed as part of the <br />permanent work where such material is called for in the <br />Contract Documents. Re-used RCP pipe shall be subject <br />to inspection and all other provisions of the Contract <br />Documents. <br /> <br />Deduction $ 1,445.00 <br /> <br />Total Deduction for Items 1 through 6 <br /> <br />$43,659.00 <br /> <br />7. Earthwork: <br /> <br />Section 02200 <br /> <br />3.3, E. Change the last sentence of the last paragraph <br />to read: <br /> <br />"....a seal slab of concrete, or other method or <br />methods as approved by the Engineer, to prevent <br />significant desiccation of the clay." <br /> <br />3.7, B. Delete the entire second paragraph. <br /> <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.