My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 - Amendment to Agreement for Professional Services with Garver engineering - Wastewater Treatment Plant Project - Amendment No. 2
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
08 - AUGUST
>
August 22
>
24 - Amendment to Agreement for Professional Services with Garver engineering - Wastewater Treatment Plant Project - Amendment No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:06:28 AM
Creation date
8/18/2022 8:50:17 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Extra Work <br />The following items are not included under this agreement but will be considered as Extra Work. Extra <br />Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner and <br />the Engineer. <br />1. Construction Package 2 Bidding Services <br />2. Construction Package 2 Construction Phase Services <br />3. Construction Phase Engineering Services <br />4. Construction Phase On-site Construction Management Services <br />5. Construction materials testing <br />6. Geotechnical services <br />7. Training of staff beyond what is described above <br />8. SSES, I&I analysis, and/or sewer system survey <br />9. Design of any improvements <br />10. Utility relocation coordination or design <br />11. Hydraulics and hydrology for floodway No -Rise Certification and Individual 404 permit <br />12. Redesign for the Owner's convenience or due to changed conditions after previous alternate <br />direction and/or approval <br />13. Submittals or deliverables in addition to those listed herein <br />14. Invasive structural evaluation techniques beyond visual observation of existing structures at <br />grade and existing record drawings <br />15. Preparation of a Storm Water Pollution Prevention Plan (SWPPP) <br />16. Environmental Handling and Documentation beyond those previously identified, including <br />wetlands identification or mitigation plans or other work related to environmentally or <br />historically (culturally) significant items <br />17. Floodplain delineation and coordination with FEMA and preparation/submittal of a CLOMR <br />and/or LOMR <br />18. Environmental Services beyond preparation and submission of a Categorical Exclusion <br />19. Sludge Management Plan <br />20. Warranty Assistance <br />21. Water Reuse Master Plan <br />22. Utility rate study <br />23. TMDL and NPDES permitting assistance <br />24. Water Conservation Plan <br />25. Drought Management Plan <br />26. Extra Meetings <br />27. Jar Testing Services <br />28. Sampling Services <br />29. Programming for control systems designed to be provided by the manufacturer, including the <br />complete aeration control system, dewatering control system, and non -potable water control <br />system <br />30. Extra meetings <br />31. Software maintenance <br />32. On-call services following completion <br />33. Phase 2 Programming Services <br />Extra Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner <br />and Garver. <br />3. Schedule <br />This schedule is not only contingent on Owner review and authorization to proceed for each Task, but <br />also regulatory and funding agencies review and response time. <br />Appendix A - Scope of Services <br />Amendment 2 5 of 6 Version 3 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.