Laserfiche WebLink
• Implement remote access to the new WWTP SCADA system via remote login software, for <br />remote view capabilities over an internet connection. Coordinate with City for network, <br />firewall, and security configuration for remote access. <br />• Develop a maximum of twenty (20) new graphic screens that are optimized for viewing <br />process status and control data on a mobile device. <br />• Assist with configuration and setup of applications on mobile and tablet devices for remote <br />access to SCADA graphics. <br />• Implement remote alarming via a software -based alarm notification system to notify plant <br />personnel of critical alarms via phone call, text, or email. <br />• Participation and coordination of two (2) virtual SCADA workshops. <br />• Participation and coordination of Factory Acceptance Testing. <br />• Provide onsite services for integration, startup, and testing of plant control systems. Eight <br />weeks of on-site startup time is expected. Additional on-site startup time due to <br />circumstances beyond the control of Garver shall be treated as extra work. The following <br />identifies the anticipated onsite services: <br />a. Participation and coordination of scheduling for the control panel site acceptance testing <br />to be performed by the Contractor as required in the contract specifications. <br />b. Refinement of initial PLC programming and HMI development for site conditions. <br />c. Interface with vendor supplied control systems. <br />d. Startup and functional testing of control systems for each process. <br />e. SCADA configuration including historical data collection, SCADA application security and <br />remote alarm notification. <br />This scope is based upon the responsibilities of the Contractor to provide the following as outlined in <br />the construction contract documents, including but not limited to: <br />• SCADA hardware components and software licensing. <br />• Vendor supplied control systems. <br />• PLC hardware, control panels, networking equipment, and system testing. <br />• Variable Frequency Drive (VFD) and instrumentation calibrations and commissioning. <br />• Plant -wide communications network <br />• Troubleshooting and correction of wiring errors or equipment failures <br />This scope is based upon the following responsibilities of the Owner: <br />• Remote access for Garver to login to the SCADA system network for remote support. <br />• Reliable high speed internet connection at the WWTP. <br />• Provide I.T. support to configure remote connectivity. <br />• Communication system for desired remote alarm notification method (cellular, phone line, <br />email, etc.) <br />Deliverables: <br />Two (2) complete copies of all programming will be provided to the Owner on USB flash <br />drives. <br />Appendix A - Scope of Services <br />Amendment 2 4 of 6 Version 3 <br />City of Paris WWTP Improvements <br />