My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-027 - Sewer failures on a 24 inch concrete pipe of the Central Interceptor
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1984
>
1984-027 - Sewer failures on a 24 inch concrete pipe of the Central Interceptor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:40:18 AM
Creation date
6/3/2005 11:42:54 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1984
Doc Type
Resolution
CITY CLERK - Date
4/18/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />2of 3 <br />III. CHEMICAL COSTS <br />Chlorine Cost /Pound Delivered To Site In 1 Ton <br />Cylinders $.14135/lb. <br />Assuming 1 MGD At A Feed Rate Of 100 PPM <br />Chlore- Chemical Cost Is $117.89 /day <br />$14_ 736.25 <br />125 Days At $117.89 /Day <br />$14,736.25 <br />TOTAL PROJECTED CHEMICAL COST <br />Cost Summary 5,745.00 <br />Site Preparation 11,948.50 <br />Chlorine Equipment & Accessories 14,736_25 <br />Chemical Cost <br />$32,429.75 <br />TOTAL PROJECTED COSTS <br />* The Site No. 1 at the end of Orr t gemSreett as chosen for <br />(300 safety and <br />accessibility. The Site is app <br />nexot closestrdwelliing. and <br />lternate one <br />locationthousand - SitN <br />Site ofeet e <br />. 2ould save <br />$1,000.00 on site preparation, but has excessive traffic. <br />** Wallace and Tiernam equipment was selected because city personnel have <br />Rottometersdwere sizzedeforlfutuureausenatntheatwoe (2)cut4ilitysplants.uTwos <br />(2) chlorinators were recommended since a breakdown could cause usage <br />of HTH at a higher cost than the purchase of a second unit• downstream <br />tion, maintenance of a chlorine dosage large enough to keep <br />complaints to a minimum is probably a major factor in determining <br />whether the City may be required to take far more expensi e measures. <br />v <br />Since chlorine is such a hazardous material, it is believed the inclu- <br />sion of a detector with an alarm for safety of the general public, a <br />gas mask for on site personnel, and a cylinder repair kit for emergencies <br />are needed for emergencies. <br />* ** It is possible to borrow a breathing apparatus from the Fire Department. <br />However, since urently Msyse <br />Raw Water Pump <br />recommended that an additional <br />ofmask <br />these ttwo purchased <br />facilitiestime, and it <br />can eventually be use a <br />
The URL can be used to link to this page
Your browser does not support the video tag.