Laserfiche WebLink
I <br />II <br />m <br />DURING EMERGENCY REPAIRS <br />EXHIbli n <br />lof3 <br />SITE PREPARATION* <br />2,360.00 <br />A. Rock 350 tons <br />195.00 <br />B. Pipe for ditch culvert <br />C. Water tap and 800" line <br />950.00 <br />950.00 <br />1. Pipe and valve <br />300.00 <br />2. Trench machine 300.00 <br />80 gal /min at <br />(chlorinator requires <br />maximum setting) <br />6 foot with barbed wire <br />D. Fence - <br />200' - 6 ' #12 ga. wire <br />14 - 2" x 11' post .065 <br />200' - 1 5/8 .065 top rail <br />200' - 12z ga twist ten. wire <br />L.G. 10 <br />2 - 3" x 10' gate post <br />post L.G. 20 <br />4 - 3" x 10' corner <br />1 5/81, x .065 gate frame 20' D.D. gate <br />1,360.00 <br />1 - <br />3 - strands 12' ga. 4 pt. barbed wire <br />E. 8' x 10' tubular steel frame, steel siding <br />(1) <br />enclosure (delivered to site, one <br />580-00 <br />delivery time) <br />_ <br />$5,745.00 <br />TOTAL SITE PREPARATION <br />CHLORINATOR EQUIPMENT AND ACCESSORIES ** <br />A. Chlorinators <br />2 - manual chlorinators <br />2000 lb. rotometer and <br />I with <br />I with 1000 lb. rotometer and <br />5,393.00 <br />2 injectors <br />1,300.00 <br />1 - regulator check valve <br />header valve, valve union,flex <br />900.00 <br />6 - <br />connection sets at $150.00 <br />300.00 <br />Misc. pipe to install unit <br />one (1) unit to site <br />400.00 <br />120.00 <br />Air Freight <br />Standard Freight one (1) unit to site <br />Delivery Time - Seven (7) Days <br />B. Safety Equipment 11100.00 <br />1. 1 - series 50 -125 chlorine detector 1,510.00 * ** <br />2. 1 - 60 min pressure demand air mask <br />3. 1 - chlorine cylinder repair kit - - - - - - 925.00 0 <br />$11,948.50 <br />TOTAL <br />