Laserfiche WebLink
4) Setbacks. Front 10 feet, sides 5 feet, and rear 20 feet. I am not 100% sure what the PD setbacks are <br />currently, but this is what would be needed for us to work for Al's plans. <br />5) Paying. Allow for asphalt streets with concrete curb and gutter. After going over the development <br />numbers, with where prices are right now, it is very tight. Allowing for asphalt helps allow the economics to <br />stay in tact if, by the time streets are poured, concrete is still so much higher than asphalt. The picture below <br />provided for number 3 also shows asphalt streets with concrete curb and gutter, which is what Betenbough <br />builds exclusively to help make the price point of the homes work. <br />Please let me know if you would like to discuss or if you have any questions. <br />Thank you, <br />Nathan <br />Noafli aii Spatilding <br />l_oiie ttar .Pl a�iiic.(a_ .De\,,elol-)iaiexits, LLC <br />11 (972) 04-4789 <br />