Laserfiche WebLink
JWTC <br />$ 175,450 $ 175,450 <br />$ 1,100 $ 1,100 <br />$ 11.83 $ 11.83 <br />$ 4,950 <br />$ 4,950 <br />$ 4.48 <br />$ 31.90 <br />$ 1,320 <br />$ 916.32 <br />$ (12,513) $ <br />$ 9,350 <br />$ (3,812) <br />$ (10,780) <br />$ (7,700) <br />$ 1,595 <br />$ 2,640 <br />$ 2,750 <br />$ 1,650 <br />$ 3,300 <br />$ 1,100 <br />$ 17,050 <br />$ 550 <br />$ 550 <br />$ 605 <br />$ 6.05 <br />$ 2,200 <br />$ 176,562 <br />RMQ <br />AT <br />Base Bid <br />$ <br />125,940 <br />$ 125,940 <br />$ <br />168,738 <br />$ 168,738 <br />Demolition <br />$ <br />3,500 <br />$ 3,500 <br />$ <br />5,000 <br />$ 5,000 <br />Disposal <br />$ <br />5,500 <br />$ 5,500 <br />$ <br />8,000 <br />$ 8,000 <br />Foundation 24.1" to 36" <br />$ <br />10,000 <br />$ - <br />$ <br />5,000 <br />$ - <br />Foundation 36.1" to 48" <br />$ <br />15,000 <br />$ <br />10,000 <br />Foundation 48.1" and above <br />$ <br />25,000 <br />$ <br />2,500 <br />Add] site material to elevate <br />$ <br />4,000 <br />$ - <br />$ <br />3,000 <br />$ <br />Low -step shower. 36" x 50" with seat <br />$ <br />250 <br />$ <br />$ <br />200 <br />$ - <br />Optional Flooring Ceramic <br />$ <br />100 <br />$ <br />10,000 <br />All sides Hardi <br />$ <br />(4,000) <br />$ - <br />$ <br />(7,000) <br />$ - <br />Brick Elevation Front only <br />$ <br />(2,200) <br />$ <br />(5,400) <br />3 sides brick back hardi <br />$ <br />(750) <br />$ - <br />$ <br />(1,800) <br />$ - <br />1/3 Brick Elevation - Front Only (deduction) <br />$ <br />(2,500) <br />$ <br />(1,000) <br />1/3 Brick Elevation - Three Sides (deduction) <br />$ <br />(2,000) <br />$ <br />(3,000) <br />Accessible Kitchen <br />$ <br />8,000 <br />$ <br />- <br />Barrier free shower w grab bars shower want <br />$ <br />5,000 <br />$ - <br />$ <br />2,000 <br />$ <br />Metal Roof 29 guage <br />$ <br />11,000 <br />$ - <br />$ <br />6,000 <br />$ - <br />Sode 10ft front and back 4 ft sides St Augustine <br />$ <br />4,500 <br />$ <br />2,000 <br />Laminate Flooring entire house <br />$ <br />2,000 <br />$ - <br />$ <br />1,000 <br />$ - <br />Laminate Kitchen only <br />$ <br />1,000 <br />$ <br />$ <br />500 <br />Septic system <br />$ <br />15,000 <br />$ <br />$ <br />2,500 <br />Seed with Bermuda and Sod on drip line <br />$ <br />250 <br />$ <br />$ <br />4,500 <br />Landscape <br />$ <br />3,000 <br />$ - <br />$ <br />3,500 <br />$ <br />Gas Stove <br />$ <br />2,000 <br />$ <br />1,250 <br />Gutters across porches <br />$ <br />3,000 <br />$ <br />1,500 <br />washer/dryer/diswasher/micro-venta hood <br />$ <br />4,500 <br />$ <br />- <br />Subtotal <br />$ 134,940 <br />$ 181,738 <br />JWTC <br />$ 175,450 $ 175,450 <br />$ 1,100 $ 1,100 <br />$ 11.83 $ 11.83 <br />$ 4,950 <br />$ 4,950 <br />$ 4.48 <br />$ 31.90 <br />$ 1,320 <br />$ 916.32 <br />$ (12,513) $ <br />$ 9,350 <br />$ (3,812) <br />$ (10,780) <br />$ (7,700) <br />$ 1,595 <br />$ 2,640 <br />$ 2,750 <br />$ 1,650 <br />$ 3,300 <br />$ 1,100 <br />$ 17,050 <br />$ 550 <br />$ 550 <br />$ 605 <br />$ 6.05 <br />$ 2,200 <br />$ 176,562 <br />